首页> 外文会议>Annual meeting of the Institute of Nuclear Materials Management >INTERNATIONAL MNSR TRAINING CENTER IN OPERATOR TRAINING FOR MNSR HEU CORE DISCHARGE AND PACKAGING
【24h】

INTERNATIONAL MNSR TRAINING CENTER IN OPERATOR TRAINING FOR MNSR HEU CORE DISCHARGE AND PACKAGING

机译:MNSR HEU核心放电和包装操作员培训国际MNSR培训中心

获取原文

摘要

The International MNSR Training Center (IMTC) was built in 2017 at the Ghana MNSR (GHARR-1) site for training operators from the MNSR reactors to offload the core and package the irradiated fuel for transportation. The IMTC was fully used in preparations for HEU removal from the Nigerian NIRR-1 research reactor. The training program was developed based on the experiences gained from nearly 70 international shipments including the GHARR-1 HEU core removal. The main goal of the training at IMTC for the Nigerian removal was to properly train NIRR-1 staff to independently carry out the entire loading and packaging operation in one day. Based on this training program the NIRR-1 training was carried out at the IMTC from March until August 2018 in three training campaigns plus one dry run demonstration. The HEU repatriation from Nigeria to China was successfully accomplished in December 2018. This paper presents the IMTC, the training program and training materials, and introduces the courses of the implemented training campaigns and summarizes lessons learned.
机译:国际MNSR培训中心(IMTC)于2017年在加纳MNSR(GHARR-1)场址上建立,用于培训MNSR反应堆中的操作员卸载堆芯并包装辐照后的燃料进行运输。 IMTC完全用于从尼日利亚NIRR-1研究堆中去除HEU的准备工作中。培训计划是根据从包括GHARR-1 HEU堆芯拆卸在内的近70批国际货运中获得的经验制定的。在IMTC进行的尼日利亚撤离培训的主要目标是对NIRR-1人员进行适当的培训,使其在一天之内独立完成整个装载和包装操作。基于此培训计划,NIRR-1培训于3月至2018年8月在IMTC上进行了三项培训活动,并进行了一次空运行演示。高浓铀从尼日利亚遣返到中国的工作已于2018年12月成功完成。本文介绍了IMTC,培训计划和培训材料,介绍了已实施的培训活动的课程并总结了总结的经验教训。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号