Piping Risk Reduction Measures for Mengkuang Dam Upgrading Project

机译:蒙嘉坝升级项目的管道风险降低措施

获取原文

摘要

Construction of the Mengkuang dam upgrading project was exposed to potential piping risk at several key areas. The variability in site geology, foundation conditions and construction materials added to the difficulty in predicting piping risk of the project. In some cases the risk factors were only uncovered during construction stage after the dam foundation was exposed. Changes to the original design, construction procedures and contract specifications had to be made in order to mitigate the risks. The techniques applied and measures implemented for risk reduction varied in each case in order to suit the actual site conditions and nature of risk encountered. This paper discussed the techniques developed and the issues related to the piping risk reduction measures implemented for the dam upgrading project. The techniques developed for alleviating piping risk was effective, judging from behavior of the dam and dam instrumentation records that were within expected ranges.
机译:Mengkuang Dam升级项目的建设暴露于几个关键领域的潜在管道风险。 现场地质,基础条件和建筑材料的可变性为预测项目管道风险的难度。 在某些情况下,在坝基暴露后,施工阶段仅揭示风险因素。 必须对原始设计,施工程序和合同规范进行更改以减轻风险。 在每种情况下适用于风险降低实施的技术和措施,以适应遇到的实际现场条件和风险性质。 本文讨论了开发的技术和与DAM升级项目实施的管道风险降低措施相关的技术。 为缓解管道风险而开发的技术有效,从大坝和水坝仪器记录中的行为判断,这在预期范围内。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号