首页> 外文期刊>Journal of Contemporary Water Research and Education >USACE Experience in Implementing Risk Analysis for Flood Damage Reduction Projects
【24h】

USACE Experience in Implementing Risk Analysis for Flood Damage Reduction Projects

机译:USACE实施防洪减灾项目风险分析的经验

获取原文
       

摘要

For about a decade now, the U.S. Army Corps of Engineers (USACE) has performed its flood damage reduction project development and improvements studies in an expanded risk analysis (RA) framework. This practice is a substantial change from policies and practices of the past, and was achieved despite significant impediments, both internal and external to the USACE. Sustaining the RA policy requires continued improvements in concepts and methods, as well as acceptance by the USACE professional Communities of Practice and the customers and stakeholders served by USACE. Hurricane Katrina and the devastation of New Orleans due to the failure of the protection system have brought increased attention by the nation to notions of risk and uncertainty in project performance. In this context, a broader embracing of RA in managing the nation's critical infrastructure may help sustain the implementation of these procedures within the USACE and the profession.This paper provides a summary of the impetus for USACE adopting RA for flood-risk-reduction project evaluation and its consequent maturing and applications over the past decade. Several papers have been published that summarize concepts and applications (e.g. Dotson 1994, Burnham 1995, Davis 2003). The present state of the RA effort within the USACE is described and illustrated here with two key applications. External challenges and concerns about the USACE adoption of RA were significant and culminated in two formal reviews by the National Research Council of the National Academy of Sciences (National Research Council 1995, 2000); the National Research Council findings are summarized here. This paper outlines deficiencies and weaknesses in present policy and methods, summarizes research needs, and presents our perception of the way forward.
机译:大约十年来,美国陆军工程兵团(USACE)在扩展的风险分析(RA)框架中进行了减少洪灾损失的项目开发和改进研究。这种做法是对过去的政策和做法的重大改变,尽管在USACE内部和外部存在重大障碍,但还是实现了这一做法。要维持RA政策,就需要不断改善概念和方法,并要获得USACE专业实践社区以及USACE服务的客户和利益相关者的接受。卡特里娜飓风和由于保护体系失败而造成的新奥尔良破坏,使该国越来越重视项目执行中的风险和不确定性概念。在这种情况下,广泛使用RA来管理国家的关键基础设施可能有助于维持这些程序在USACE和专业领域内的实施。及其在过去十年中的成熟和应用。已经发表了几篇总结概念和应用的论文(例如Dotson 1994,Burnham 1995,Davis 2003)。 USACE中RA工作的当前状态在此通过两个关键应用进行了描述和说明。美国科学研究院国家研究委员会的两次正式审查最终导致了外部挑战和对USACE采用RA的担忧(国家研究委员会1995,2000);国家研究委员会的调查结果总结如下。本文概述了当前政策和方法的不足和不足,总结了研究需求,并提出了我们对前进方向的看法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号