首页> 外文会议>IEEE Far East NDT New Technology amp;amp;amp;amp;amp;amp; Application Forum >Implementation and optimization Strategy for SG Primary Side Cross Inspections
【24h】

Implementation and optimization Strategy for SG Primary Side Cross Inspections

机译:SG初级侧面交叉检查的实施与优化策略

获取原文

摘要

SG primary side cross inspections (PSCI) are very important in-service inspection items in nuclear island. In most cases for nuclear power station they take the critical paths of the refueling outages. Based on the current implementation strategies of SG PSCI, the potential problems for eddy current inspection on SG tubes, CCTV inspection on SG primary side internal surfacing layer and the transition between the two items are analyzed. Optimization strategies for SG PSCI are proposed, aimed at optimizing the work time and reducing the collective dose, which is in conformity with the principle of Safety First, Quality Foremost.
机译:SG初级交叉检查(PSCI)是核岛的非常重要的在职检查项目。在大多数核电站案件中,他们采取了加油中断的关键路径。基于SG PSCI的当前实施策略,分析了SG管上涡流检测的潜在问题,分析了SG初级侧内部堆积层的CCTV检查和两件物品之间的过渡。提出了SG PSCI的优化策略,旨在优化工作时间并减少集体剂量,符合安全原则,最重要的优惠。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号