【24h】

Grid restoration planning after a total blackout

机译:全部停电后网格恢复规划

获取原文

摘要

Restoration of a power system after a total black out poses some serious challenge for power system operators. The main reason is the necessity of black start units. Due to economic reasons, it is not feasible to provide black star capability for all power stations. The location and capacity of black start units play an important role in deciding the restoration strategy after a black out. The parallel building up and synchronization of electrical islands is the widely accepted practice for bulk grid restoration. In case of a total blackout, finding an amicable solution to important restoration tasks like the number of independent islands to be formed, configuration and loading of the islands, reserve capacities, and selection of restoration path requires assessment of blackstart capability of plants and location of the blackstart unit. This paper proposes a restoration algorithm that can be used on the event of a total blackout and application of the proposed algorithm to the case study of North Kerala grid.
机译:在全面黑色外面恢复电力系统对电力系统运营商带来了一些严峻的挑战。主要原因是黑色起始单位的必要性。由于经济原因,为所有发电站提供黑色明星能力是不可行的。黑色起始单位的位置和容量在黑色外面决定恢复策略方面发挥着重要作用。电岛的平行建筑和同步是散装网格恢复的广泛接受的做法。如果是全天空,为重要的恢复任务找到友好的解决方案,如要形成的独立岛屿数量,岛屿,储备能力和恢复路径的选择,需要评估植物和位置的Blackstart能力Blackstart单元。本文提出了一种恢复算法,可以在北喀拉拉邦网格的案例研究中,在北喀拉拉邦网格的情况下,可以使用总停电和应用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号