首页> 外文会议>IEEE Intl Conf on Ubiquitous Computing amp;amp;amp;amp;amp;amp; Communications >Efficient Coflow Scheduling of Multi-Stage Jobs with Isolation Guarantee
【24h】

Efficient Coflow Scheduling of Multi-Stage Jobs with Isolation Guarantee

机译:具有隔离保证的多级作业的高效COFLOW调度

获取原文

摘要

Coflow scheduling is critical for data-parallel computing performance in datacenters. Performance and isolation guarantee have become two major objectives for coflow scheduling. However, in the context of multi-stage jobs, existing coflow scheduling frameworks only focus on minimizing the average job completion time (JCT) while overlooking the isolation guarantee. To address this problem, in this paper we propose the first coflow scheduling scheme that aims to achieve both objectives. We show that our scheduler outperforms existing alternatives significantly in minimizing average JCT while guaranteeing that no job will be delayed beyond a constant time than its JCT in a fair scheme. Our evaluation results show that our scheduler reduces the average JCT by at least 86% compared with state-of-the-art schedulers.
机译:Coflow Scheduling对于DataCenters中的数据并行计算性能至关重要。性能和隔离担保已成为Coflow调度的两个主要目标。但是,在多阶段作业的上下文中,现有的Coflow调度框架仅关注最小化平均作业完成时间(JCT),同时忽略隔离保证。为了解决这个问题,在本文中,我们提出了旨在实现两个目标的第一个Coflow调度方案。我们表明我们的调度器在最大限度地减少平均JCT时显着优于现有的替代方案,同时保证在公平计划中没有JCT之外不会延迟工作。我们的评价结果​​表明,与最先进的调度员相比,我们的调度员将至少86 %降低了至少86 %。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号