首页> 外文会议>International Symposium on e-Manufacturing and Design Collaboration >Dynamic scheduling of product-mix production systems of MTS and MTO
【24h】

Dynamic scheduling of product-mix production systems of MTS and MTO

机译:MTS和MTO产品混合生产系统的动态调度

获取原文

摘要

This paper discussed real-time solutions to product-mix scheduling problems (PMSPs) when a loading or a capacity of Fab are dynamically changing. The objective is that maximization of the resource utilization while keeping a due date and Q-time restrictions of every production lot. Particularly, two methods, P3D (Pseudo-Periodically Priority Dispatching) and the Palmer, are introduced for Make-to-Stock (MTS) and Make-to-Order (MTO) productions. After P3D's capabilities and limits about using demand forecasting are discussed, we newly introduced EDD-Palmer dispatching for product-mix MTO production for a case the demand prediction is difficult. The EDD-Palmer method evaluated for an actual wafer test process by comparing with EDD and EDD-CDS methods. This paper was concentrated in an optimal work leveling and dispatching of MTO WIPs.
机译:本文讨论了在装载或工厂的容量动态变化时对产品混合调度问题(PMSP)的实时解决方案。目的是,资源利用率最大化,同时保持每种生产批次的截止日期和Q时间限制。特别地,引入了两种方法P3D(伪周期性优先调度)和帕尔默,用于制造对库存(MTS)和按订单(MTO)制作。在P3D的能力和关于使用需求预测的限制之后,我们新推出了对产品混合MTO生产的EDD-Palmer调度,以便需求预测困难。通过与EDD和EDD-CDS方法进行比较,对实际晶片测试过程评估的EDD-PALMER方法。本文集中在最佳的工作水平和调度MTO WIPS中。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号