首页> 外文会议>Biennial International Conference on Power and Energy Systems: Towards Sustainable Energy >A new approach for fault location on modern distribution systems with integrated DER
【24h】

A new approach for fault location on modern distribution systems with integrated DER

机译:综合DER中现代分销系统故障位置的新方法

获取原文

摘要

This paper proposes a new efficient and accurate fault location technique for modern distribution systems with integrated Distributed Energy Resources (DER).The algorithm requires only the voltage and current phasor information from source end of the system in case of a fault event. The main advantage is that it does not require any measurements from the Distribution Generation (DG) node, since it estimates the unknown infeed current using the known measurements and line parameters. The proposed fault location method is tested with various conditions such as type of fault, fault resistance, inception angle, source to line impedance rations (SIR), load angle and Distribution Generation (DG) penetration level by using PSCAD/EMTP simulations. The PSCAD/EMTP simulation studies demonstrate that the proposed method give high accuracy under various power system and fault conditions.
机译:本文提出了具有集成分布式能源(DER)的现代分配系统的新型高效和准确的故障定位技术。该算法仅需要来自系统源端的电压和电流相位信息,如果发生故障事件。主要优点是它不需要来自分布生成(DG)节点的任何测量,因为它估计使用已知测量和线参数的未知进给电流。通过使用PSCAD / EMTP仿真测试了所提出的故障定位方法,例如故障类型的故障类型,故障,成立角度,源,负载角度和分布(DG)穿透级别。 PSCAD / EMTP仿真研究表明,该方法在各种电力系统和故障条件下提供了高精度。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号