The risk sharing of client request error terms in DB mode

机译:客户端请求错误术语的风险共享在DB模式下

获取原文

摘要

The DB general contractor needs to be done according to client requirement design of part or all of the work, the developer in the preliminary design stage tender, general mainly provide relevant conceptual, basic requirements of the project, which unavoidably exist errors and biases. As for the request is not clear, the design information is not complete, time nervous cause design accuracy is not enough. If the employer in the bidding and construction drawing design stage, while the developer provides a relatively detailed design documents, but there still may be inevitable errors. The developer because of subjective or objective error causes of client request, may cause delays due to design changes and changes to problems such as the price dispute, engineering change agreement is not clear lead to change the understanding of both parties after the occurrence of deviation, change the controversy, the key to solve the dispute of engineering change is to clarify what kind of work does fall within the scope of engineering change adjustment.
机译:DB一般承包商需要根据客户要求设计的一部分或全部工作,开发商在初步设计阶段招标,一般主要提供相关的概念,基本要求的项目,这是不可避免的存在错误和偏见。至于要求尚不清楚,设计信息不完整,时间神经原因设计准确性还不够。如果雇主在竞标和施工绘图设计阶段,而开发人员提供相对详细的设计文件,但仍可能是不可避免的错误。由于客户请求的主观或客观错误原因,开发人员可能会导致由于设计变化和价格纠纷等问题的变化导致延误,工程变更协议尚未明确导致在发生偏差后改变对双方的理解,改变争议,解决工程变革争端的关键是澄清什么样的工作确实属于工程变更调整范围。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号