首页> 外文会议>International Conference on Advanced Manufacturing Technology and Materials Engineering >The Research of Water Flooding Measures in Late High Water Cut Period of Secondary Reservoirs
【24h】

The Research of Water Flooding Measures in Late High Water Cut Period of Secondary Reservoirs

机译:二次水库后期高污水削减期水淹措施研究

获取原文

摘要

Daqing oilfield is in high water cut stage and always appears two phenomenon called "two speeds" and "two low". Based on the geological characteristics of the block, the current exploration wells arrangement and producing dynamics, two sets programs of water injection intensity and water injection timing were designed. Through the numerical simulation prediction of the two sets of 16 programs, the optimization results are 9 injection intensity and 93% of water cut. The cumulative oil producing capacity is 1402.41×10~4t and the cumulative increasing oil capacity is 6.26×10~4t and the increasing value of the recovery efficiency in Secondary oil layer is 1.33% when the water cut is 98%.
机译:大庆油田处于高水位阶段,始终出现两个称为“两个速度”的现象和“两个低”。 基于块的地质特征,目前的勘探井排列和产生动力学,设计了两组注水强度和注水计时。 通过两组16个程序的数值模拟预测,优化结果是9个注射强度和93%的水切割。 累积油产能为1402.41×10〜4t,累积增加的油容量为6.26×10〜4t,当水切口为98%时,次级油层中恢复效率的增加值增加1.33%。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号