首页> 外文会议>International Conference on Industrial Technology and Management Science >A Long-term Power Purchase Optimization Method Considering the Equal Completion Progress and Minimize Power Purchase Cost
【24h】

A Long-term Power Purchase Optimization Method Considering the Equal Completion Progress and Minimize Power Purchase Cost

机译:考虑到同等完成进度的长期电力购买优化方法,最大限度地减少电力购买成本

获取原文

摘要

The current long-term purchase power optimization, mainly consider the equal completion policy requirements, and do not consider the optimization of power purchasing cost. This paper presents a long-term power purchase optimization method, which uses the electricity purchasing cost as the goal, with the equal completion as the constraint, considering the generator load rate, unit maintenance and other constraints. It is MIP model which using provincial data to analysis.
机译:目前的长期购买功率优化,主要考虑平等的完工政策要求,并不考虑优化电力购买成本。本文介绍了一种长期的功率购买优化方法,它使用电力购买成本作为目标,同时完成作为约束,考虑到发电机负载率,单位维护和其他约束。它是使用省级数据进行分析的MIP模型。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号