首页> 外文会议>International Conference on Frontier of Energy and Environment Engineering >L block injection-production system adjustment method optimization
【24h】

L block injection-production system adjustment method optimization

机译:L块注射 - 生产系统调整方法优化

获取原文

摘要

Oilfield development initial stage, people tend to use more sparse well pattern development, production capacity better horizon, reserves were concentrated, inadequate reserves producing remaining oil. In oilfield entered the later period of high water cut development stage, well pattern infilling occupies the important status in production management, and to a large extent determines the production scale of middle and later periods of the oilfield, fixed number of year of exploitation, the final recovery efficiency and economic benefit of oil field. Early L block by 300 m by 300 m spacing against nine points injection pattern, water and residual oil distribution in the oil field development is bound to be late to adjust the encryption pattern, in order to L blocks to determine reasonable well pattern adjustment methods, studies the impact on the development effect of the infilled adjustment of, on the basis of combining economic evaluation, determine the reasonable way of adjustment.
机译:油田开发初步阶段,人们倾向于采用更稀疏的井模式开发,生产能力更好地平线,储量集中,储量不足,储量不足,生产剩余的油。在油田进入后期高水平开发阶段,井图案infilling占据了生产管理的重要地位,在很大程度上决定了油田中间和后期的生产规模,固定了剥削年数,油田的最终恢复效率和经济效益。 L早期的L块300米的间距300米对九点注射图案,水和剩余油分布在油田开发中必然会迟到调整加密模式,以便L块确定合理的井图案调整方法,研究对经济评估结合的基础上潜入调整的发展效应的影响确定了合理的调整方式。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号