首页> 外文会议>Conference on Engineering Modelling and Simulation >On Moral Hazard of Construction Project Visual Organization
【24h】

On Moral Hazard of Construction Project Visual Organization

机译:论建设项目视觉组织的道德危害

获取原文

摘要

Modern construction projects are developing towards large-scale, complex and integrated. The management of construction projects needs support of new organization systems. Based the latest results in the field of project management and the theory of manufacturing visual organization, using the game theory, we set up analysis model for moral hazard of construction project visual organization under various situations, obtain contract conditions to prevent moral hazard by solving the model, and prevent moral hazard by controlling contract condition parameters.
机译:现代建筑项目正在发展大规模,复杂和集成。建设项目管理需要支持新组织系统。基于项目管理领域的最新结果和制造视觉组织理论,使用博弈论,在各种情况下建立建筑项目视觉组织的道德风险分析模型,获得合同条件,以防止道德危害模型,防止道德危害控制合同条件参数。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号