In order to quantitatively forecast failure scope, Xiaozhaizihe Reservoir concrete arch dam is chosen as a dam-break event case in this paper. 3-D solid model is built and elastic-plastic finite element method is used by ANSYS software. The dam work conditions of its water levels, its temperature drop and weight are defined by the early period storage and climatic conditions. The dam-break loads (or forces) of the dam and its base are simulated. Results show that the dam structure is not strong enough, and its design is not meeting the specifications, and the weakest position of dam is at the junction both phase I and phase II of the cold concrete. So it's concluded that the dam-break early occurred where the compressive and tensile strength M-C safety factor is less than 1, and the dam-break end-scope cover the safety factor 2.0 M-C so that people forecast the quantitative failure scope of concrete dam.
机译:为了定量预测失败范围,Xiaoozhaizihe水库混凝土拱坝被选为本文中的坝体断裂事件案例。构建了3-D实体模型,ANSYS软件使用弹性塑料有限元方法。其水位的坝上工作条件,其温度下降和重量由早期储存和气候条件定义。模拟大坝及其基部的坝断裂载荷(或力)。结果表明,大坝结构不够强大,其设计不符合规格,大坝最弱的位置处于结射2和冷凝土的第二阶段II。所以它得出结论:早期发生的坝断裂,其中压缩和拉伸强度M-C安全系数小于1,坝断裂端范围覆盖安全因子2.0 m-c,以便人们预测混凝土坝的定量故障范围。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号