首页> 外文会议>International Conference on Functional Materials and Nanotechnology >Numerical analysis on the characteristics of settlement deformation of the high rock-filled embankment during the construction period
【24h】

Numerical analysis on the characteristics of settlement deformation of the high rock-filled embankment during the construction period

机译:施工期间高岩石填充路堤沉降变形特征的数值分析

获取原文

摘要

Embankment filling is a process step by step. The influences of its filling height changes on the stress and deformation can not be reflected in a load. However, in the actual construction, it leads to quality accident in embankment construction that filling usually doesn't control the thickness according to the requirement of construction specification. In order to reveal the stress and strain law of about 72 m high rock-filled embankment during the construction, and provide a scientific reference to construction quality control of the embankment, according to the typical cross section of the Hurongxi highway, using two loading modes to simulate the embankment filling, the internal stress, strain and corresponding graphics of different control points of the embankment under the various loads were presented. The results of the two loading modes are analyzed and compared. It shows that the settlement, stress and construction quality control points of the embankment are different and larger under the different loading.
机译:堤防填充是一步一步一步的过程。其填充高度对应力和变形的影响不会反映在负荷中。然而,在实际建设中,它导致堤防建筑的质量事故,填充通常不根据施工规范的要求控制厚度。为了揭示施工过程中约72米高的岩石填充路堤的压力和应变法,并根据鲁隆西高速公路的典型横截面,提供了对堤防施工质量控制的科学参考为了模拟堤防填充,提出了在各种载荷下堤防不同控制点的内应力,应变和相应图形。分析了两种加载模式的结果并进行了比较。它表明,在不同的装载下,堤防的沉降,应力和施工质量控制点不同且较大。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号