首页> 外文会议>Conferece IPEC >Study on Interval-Based Economic Evaluation Methods for Power Construction Projects
【24h】

Study on Interval-Based Economic Evaluation Methods for Power Construction Projects

机译:电力建设项目间隔经济评价方法研究

获取原文

摘要

This paper introduces an interval-based approach in economic evaluation on power construction projects. Firstly, interval models are set up to extend classic methods, including Interval Net Present Value method, Interval Payback Period method, Interval Internal Rate of Return method. Additionally, a method to measure risk is also proposed. Then, cases are given to test and compare these interval methods under both certain and uncertain life period conditions. Case study suggests that the interval-based methods are efficient and flexible to deal with evaluation problems on power construction projects, which can effectively judge the feasibility of a project, as well as estimate the risk likely to be undertaken. Finally, these three typical methods are comprehensively compared in order to give instruction of practical application.
机译:本文介绍了基于间隔的电力建设项目经济评估方法。首先,设置间隔模型以扩展经典方法,包括间隔净现值方法,间隔回收周期方法,返回方法的间隔内部速率。另外,还提出了一种测量风险的方法。然后,给出了在某些和不确定的生命周期条件下进行测试和比较这些间隔方法。案例研究表明,基于间隔的方法是有效且灵活地处理电力建设项目的评估问题,这可以有效地判断项目的可行性,以及估计可能进行的风险。最后,综合地进行了这三种典型方法,以便提供实际应用的指示。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号