首页> 外文会议>IADC/SPE International Drilling Conference and Exhibition >An Automated Workflow for Real-Time Monitoring and Benchmarking ofConnection Time in Drilling Operations
【24h】

An Automated Workflow for Real-Time Monitoring and Benchmarking ofConnection Time in Drilling Operations

机译:用于钻井操作中的实时监控和基准测试的自动化工作流程

获取原文

摘要

Invisible lost time (ILT) during drilling can add up to be extremely costly. Since a significant portion of ILToccurs during drilling and tripping operations (including running casing), the aim is to develop a workflowbased on analytics algorithms that accurately identify and record how long it takes to make both drillingand tripping connections in real time using 1-second surface data. By capturing these KPIs, performancedifferences across the rig fleet were identified, and best practices were shared. The developed workflow and algorithms for the drilling and tripping connection times can be appliedto both active and historical wells in a fully automated fashion. The algorithm consumes 1-second surfacedrilling data to identify each connection. For more in-depth analysis, the drilling connection is divided intothree stages: pre-connection, slip-to-slip, and post-connection. The algorithm relies on an advanced "rigstate" (e.g., drilling, tripping in, tripping out, running casing) to determine the current state of the drillingprocess.
机译:钻井期间隐形丢失的时间(ILT)可以加起来非常昂贵。由于在钻井和跳闸操作期间的ILTOCCURS(包括运行壳)的重要部分,因此目的是在分析算法上开发工作流程,该工作流程准确地识别和记录使用1秒表面实时制作钻井和跳闸连接所需的时间数据。通过捕获这些KPI,确定了钻机舰队的表演,并分享了最佳实践。钻孔和跳闸连接时间的开发工作流程和算法可以以全自动的方式适用于主动和历史井。该算法消耗了1秒的SurfacedRilling数据以识别每个连接。对于更深入的分析,钻孔连接分为插入级:预连接,滑动滑动和后连接。该算法依赖于先进的“瑞奋器”(例如,钻孔,跳闸,绊倒,运行壳体)以确定钻孔过程的当前状态。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号