首页> 外文会议>SPE/ICoTA Well Intervention Conference and Exhibition >A Detailed Evaluation of Coiled Tubing Drillouts of Composites andDissolvable Plugs In Permian Basin and Eagle Ford Fields
【24h】

A Detailed Evaluation of Coiled Tubing Drillouts of Composites andDissolvable Plugs In Permian Basin and Eagle Ford Fields

机译:复合材料卷管钻头的详细评估,在二叠钟盆地和鹰福特领域吞气

获取原文

摘要

Coiled tubing(CT)operations in Texas are distributed in the Permian Basin and Eagle Ford plays supportingunconventional completion of horizontal wells using plug-and-perf technology.CT drillouts are a key step inperforming the plug removal and achieving full production potential.From a wide variety of plugs available,the most common plugs are composite and dissolvable.This study presents an evaluation of both plugs forCT drillout.The analysis gathers post-drillout data from CT interventions in the Permian basin and the Eagle Ford:63 wells completed exclusively with 2,664 composite plugs,60 wells completed with a combination of bothtype of plugs for a total of 382 dissolvable plugs and 1,792 composite plugs,and 16 wells completed with543 dissolvable plugs.Data were analyzed for correlations between well geometry;lateral length;plugsused;dissolvable plug location in the lateral(heel,toe,full lateral);and key performance indicators(KPIs)such as time in well,average milling,wash times,plugs spacing and total number of plugs.The evaluation was conducted by comparing wells completed with only composite plugs,onlydissolvable plugs,or a combination of both types,and it included a review of dissolvable plug dissolutionperformance.Composite plugs show a consistent milling performance for laterals of 1 and 1.5 miles,with anaverage milling time of 4 to 5 min and a variance of 3 min and wash times of 26 min;for laterals longer than1.5 miles,the performance declines.When evaluating laterals completed with dissolvable plugs averagemilling time is 7 to 9 min,and the variance increases with the lateral length,with wash times of 26 to 36min.Wells completed with a combination of dissolvable plugs on the toe and composites in the rest of thelateral show an improved overall performance,with constant milling times of 4 to 5 min regardless of thelateral length and variance of 1 to 3 min;the overall time in the well when plugs are combined is reduced by46% compared to laterals completed with dissolvable only.The analysis also determined that at least 45%of dissolvable plugs did not dissolve and required CT intervention.The aim of this is study is to give operators a tool to assess the costs and benefits of using different plugtechnologies with a strategic placement to execute interventions in the safest and most efficient manner.Additionally,dissolvable plugs are commonly associated with cost reduction related to eliminating the needfor CT milling.However,the data shows that inconsistent dissolution of the dissolvable plugs adds anuncertainty factor,which can only be dissipated with intervention using CT.
机译:德克萨斯州的盘绕管(CT)操作分布在二叠纪盆地和鹰福特播放使用插头和PET技术支持横向完成水平井.CT钻头是一个关键步骤,既宽阔可用的各种插头,最常见的插头是复合性和可溶解的。本研究提出了对PERCT钻头的插头评估。分析从二叠纪盆地和鹰福特的CT干预措施收集钻取后数据:63孔专门与2,664井完成复合插头,60个孔,通过插头两种晶片的组合完成,总共382个可溶解的塞子和1,792个复合塞,以及16个井完成了543个可溶解的塞子。井几何之间的相关性进行了分析;横向长度;插胶;可溶性插头位置在横向(脚跟,脚趾,完整的横向);和关键的性能指标(KPI),如时间井,平均铣削,洗涤时间,插头S间距和插头总数。通过比较仅用复合插头的井,唯一的溶解塞或两种类型的组合进行比较进行评估,并且它包括可溶解的插头解除溶解性换算液的综述为侧面表示一致的铣削性能在1和1.5英里,anaverage铣削时间为4至5分钟,差异为3分钟,洗涤时间为26分钟;对于横向长度超过1.5英里,性能下降。评估侧面的横向于平均时间可溶解的塞子。 7至9分钟,方差随着横向长度的增加,36至36min的洗涤时间。在其余的脚趾和复合材料上完成的溶解塞组合,其余的整体性能提高,具有恒定的研磨时间无论1至3分钟的细长和方差如何,4至5分钟;与侧面的塞子相比,当插头组合时,井中的井中的总时间减少了46%仅限分析。分析也确定至少45%的可溶解插头没有溶解和所需的CT干预。这是研究的目的是为运营商提供使用不同插件与战略展示的工具来评估使用不同插件的工具以最安全和最有效的方式执行干预措施。解冻,可溶解的插头通常与消除CT铣削的需求有关的成本减少相关。然而,数据显示可溶解的塞的溶解不一致增加了ununctainty因子,只能散发使用CT的干预。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号