首页> 外文期刊>NGW's Gas Market Reconnaissance >DCP Midstream's board has given the green light for the construction of the Sand Hills Pipeline to provide natural gas liquids transportation from the Permian and Eagle Ford basins to the Gulf Coast
【24h】

DCP Midstream's board has given the green light for the construction of the Sand Hills Pipeline to provide natural gas liquids transportation from the Permian and Eagle Ford basins to the Gulf Coast

机译:DCP Midstream的董事会已批准建设Sand Hills管道,以提供从二叠纪盆地和Eagle Ford盆地到墨西哥湾沿岸的天然气液体运输服务

获取原文
获取原文并翻译 | 示例
       

摘要

The Sand Hills Pipeline will consist of approximately 720 miles of 20-inch pipeline with an initial capacity of 200,000 barrels per day, which can grow to 350,000 bbl/d with the addition of pumping stations. Sand Hills will be phased into service, with the first phase completed by the third quarter of 2012 to accommodate DCP's growing Eagle Ford liquids volumes.
机译:沙丘管道将由大约720英里的20英寸管道组成,初期产能为每天20万桶,加上泵站,其日产量将增至35万桶。 Sand Hills将分阶段投入使用,第一阶段将于2012年第三季度完成,以适应DCP不断增长的Eagle Ford液体量。

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号