Automatic Tower Crane Lifting Path Planning Based on 4D Building Information Modeling

机译:基于4D建筑信息建模的自动塔式起重机提升路径规划

获取原文

摘要

Lifting path planning of tower crane affect safety and efficiency of crane operations directly in a crane lifting cycle. Appropriate lifting path planning can not only avoid collision, but also save lifting time. Previous research focused on the fastest lifting path in path planning, this could be local optimum in lifting speed. But to cooperate with the fastest tower crane lifting plan, construction site may need more workers and resources, the related cost would be increased, and there would not be the global optimum in construction project level. On the other hand, 4D BIM could give effective support for construction planning and reflect the optimized schedule with resource balance in project level. Hence in real construction activities, the crane operations should follow the schedule planning in 4D BIM. Based on 4D BIM, this paper presents a method for automatic tower crane lifting path planning. We choose the concrete transport as a virtual test, the concrete is transported by hook with hopper and it has several target positions. A lifting path planning solution linked with 4D BIM is presented in this paper. Planning of securing position, transporting lifting path, releasing target position, and repositioning position in a crane lifting cycle are generated automatically in a virtual environment according to 4D BIM data. Such demonstration of our virtual test shows that the presented 4D-BIM-based automatic path planning method can generate lifting paths by following 4D BIM and give effective support to crane operations.
机译:塔式起重机的提升路径规划在起重机提升循环中直接影响起重机操作的安全性和效率。适当的提升路径规划不仅可以避免碰撞,还可以节省升降时间。以前的研究专注于路径规划中最快的提升路径,这可能是升降速度的局部最佳。但要与最快的塔式起重机提升计划合作,施工现场可能需要更多的工人和资源,相关成本会增加,并且在建设项目层面上没有全球最优。另一方面,4D BIM可以有效支持施工规划,并反映项目级别的资源平衡的优化计划。因此,在真正的施工活动中,起重机运营应遵循4D BIM中的日程计划。基于4D BIM,本文提出了一种自动塔式起重机提升路径规划的方法。我们选择混凝土运输作为虚拟测试,混凝土用料斗用钩子运输,它有几个目标位置。本文提出了一种与4D BIM相关联的提升路径规划解决方案。根据4D BIM数据在虚拟环境中自动生成固定位置,运输提升路径,释放目标位置和重新定位位置的规划。我们虚拟测试的示范表明,所呈现的4D-BIM的自动路径规划方法可以通过以下4D BIM产生提升路径,并为起重机操作提供有效的支持。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号