首页> 外文会议>AIAA Propulsin and Energy Forum;Conference on Gas Turbine Engines >The method of matching the joint work of the auxiliary power unit and turbostarter and determining the start time of the gas turbine engine
【24h】

The method of matching the joint work of the auxiliary power unit and turbostarter and determining the start time of the gas turbine engine

机译:匹配辅助动力单元和涡轮机的关节工作的方法,并确定燃气轮机发动机的开始时间

获取原文

摘要

The paper describes the methodology developed by the authors for matching the working process of the auxiliary power unit and the air turbine used when starting the engine. This technique is used to determine the possibility of starting a gas turbine engine, as well as to calculate its time and main parameters under all operating conditions (including in flight) and to select new auxiliary power units or an air turbine for an existing system. The developed technique considers structural, strength, operational and other limitations. The results were implemented as a computer program.
机译:本文介绍了作者开发的方法,用于匹配辅助动力单元的工作过程和启动发动机时使用的燃气轮机。该技术用于确定启动燃气涡轮发动机的可能性,以及在所有操作条件(包括飞行中)下计算其时间和主要参数,并为现有系统选择新的辅助电源单元或空气涡轮机。开发技术考虑了结构,强度,操作和其他限制。结果实施为计算机程序。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号