首页> 外文会议>International Conference on Human Interaction and Emerging Technologies >Project Planning Methodology Based on Lean Philosophy and PMBOK Guidelines for SMEs in the Electricity Sector
【24h】

Project Planning Methodology Based on Lean Philosophy and PMBOK Guidelines for SMEs in the Electricity Sector

机译:项目规划方法基于精益哲学和PMBOK在电力部门中小企业指南

获取原文

摘要

Currently, businesses implementing electrical projects lack the theoretical knowledge of ways to correctly develop the projects given that they are based on empirical knowledge. Consequently, a need has developed to implement lean philosophy and project management as distinctive and renowned pillars to ensure high competitiveness in the market of the sector under study. Through case studies, the literature on the subject demonstrated the importance of proper planning based on cost and time pillars. These pillars were analyzed using Ishikawa tools and a problem tree. The following lean tools were chosen: 5S, visual management, and quality circles. These tools and the project management guidelines, specifically the 47 processes published in the 5th edition of the Project Management Body of Knowledge, were applied as a model proposal at a pilot company in which the results of how this combination of solutions reduces delivery times for that organization were compared.
机译:目前,实施电气项目的企业缺乏正确发展项目的理论知识,因为它们是基于经验知识。因此,需要发展精益哲学和项目管理,作为独特和着名的柱子,以确保在研究部门的市场市场上的高竞争力。通过案例研究,主题的文献证明了基于成本和时间柱的适当规划的重要性。使用Ishikawa工具和问题树分析了这些支柱。选择以下精益工具:5岁,视觉管理和质量圈。这些工具和项目管理指南,特别是第5版项目管理机构发布的47个进程被应用于试点公司的模型提案,其中解决方案组合如何降低交货时间组织进行了比较。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号