首页> 外文会议>International Conference on Energy Science and Applied Technology >The Time to Eliminate the Expansion Joints of Diversion Pipeline in Wanjiazhai Hydropower Station
【24h】

The Time to Eliminate the Expansion Joints of Diversion Pipeline in Wanjiazhai Hydropower Station

机译:在万家寨水电站消除转移管道扩展关节的时间

获取原文

摘要

At present, many hydropower stations eliminate the expansion joints to solve the pipe leakage problem. It's very important to control the welding environment temperatures in eliminating the final weld joint of the expansion joints. To address this problem, by adopting three-dimensional finite element model in studying the hydro project of Wanjiazhai, this paper analyzes the stress state of steel pipe in all welding environment temperatures in details and suggests the proper range of welding environment temperatures. Researchers suggest that May is suitable to perform welding.
机译:目前,许多水电站消除了膨胀接头以解决管道泄漏问题。控制焊接环境温度在消除膨胀接头的最终焊接接头时非常重要。为了解决这个问题,通过采用三维有限元模型研究万家寨水电项目,分析了所有焊接环境温度的钢管应力状态,并提出了适当的焊接环境温度范围。研究人员表明,可能适合执行焊接。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号