首页> 外文会议>International Conference on Energy Science and Applied Technology >The numerical simulation and Deformation analysis to the deep foundation pit of diaphragm wall based on Midas/GTS
【24h】

The numerical simulation and Deformation analysis to the deep foundation pit of diaphragm wall based on Midas/GTS

机译:基于Midas / GTS的隔膜墙深基坑数值模拟及变形分析

获取原文

摘要

Taking the J2 area YK10+615~YK10+650 miles section related to the connection line of River-crossing tunnel to Nanjing plum delta--the youth Olympic axis underground traffic system engineering as the background, the 3d model is established by using finite element software MIDAS/GTS, the mileage period of excavation process is simulated, discuss the influence of excavation on adjacent soils. Calculation results show that the excavation will inevitably cause deformation of adjacent soil, and comparing the results of calculate and the actual monitoring data show that the method has certain guiding significance to actual engineering.
机译:以J2面积Yk10 + 615〜YK10 + 650英里段与河流过隧道连接线与南京梅德拉 - 青年奥运轴地下交通系统工程作为背景,通过使用有限元建立3D模型软件MIDAS / GTS,模拟挖掘过程的里程周期,探讨了挖掘对邻近土壤的影响。计算结果表明,挖掘将不可避免地引起相邻土壤的变形,并比较计算结果和实际监测数据表明该方法对实际工程具有一定的指导意义。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号