首页> 外文会议>International Conference on Organizational Innovation >PARALLEL SERIES SCHEDULING FOR AIRCRAFT OVERHAUL MAINTENANCE
【24h】

PARALLEL SERIES SCHEDULING FOR AIRCRAFT OVERHAUL MAINTENANCE

机译:飞机大修维护的并行系列调度

获取原文

摘要

Overhaul maintenance of an aircraft is carried out periodically based on the age standard of its flight hours. The overhaul maintenance can also be executed when there is an emergency condition which requires heavy maintenance. Hawk MK-209 aircraft previously needed overhaul time as per technical orders for 283 working days or equivalent to 14 months. By arranging the maintenance activities and considering the logic of dependence, using Critical Path Method (CPM) and Project Evaluation and Review Technique (PERT), the aircraft's overhaul time can be accelerated to 81 working days, equivalent to four months. This achievement was continued by involving consideration of the parallel series maintenance scheduling method with the help of MS Project and Arena Simulation so that the total overhaul time was only 31working days per aircraft. Thus, the combined CPM PERT and parallel series scheduling methods through Arena simulation, can result in total efficiency of overhaul time per aircraft from 283 working days to 31 working days, or equivalent to 89% efficiency.
机译:根据其飞行时间的年龄标准,定期进行飞机的大修维护。当存在需要重大维护时,也可以执行大修维护。 Hawk MK-209飞机以前需要根据技术订单所需的大修时间283个工作日或相当于14个月。通过安排维护活动并考虑依赖的逻辑,使用关键路径方法(CPM)和项目评估和审查技术(PERT),飞机的大修时间可以加速到81个工作日,相当于四个月。通过涉及在MS项目和竞技场模拟的帮助下涉及并行系列维护调度方法审议并行的序列维护调度方法,继续进行这一成就,因此每次航空器的总大修时间仅为31天。因此,通过竞技场模拟,通过竞技场模拟的组合的CPM PERT和并联系列调度方法可以从283个工作日到31个工作日,或相当于89%的效率,从而导致每次飞机的总效率。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号