首页> 外文会议>Conference on water and power >Chapter 16 Negotiating Water Institutions in the Dong-Nai River Basin, Vietnam: Unstable Balance Between Conservatism and Innovation
【24h】

Chapter 16 Negotiating Water Institutions in the Dong-Nai River Basin, Vietnam: Unstable Balance Between Conservatism and Innovation

机译:第16章越南东奈河流域谈判水机构:保守主义与创新之间的不稳定平衡

获取原文

摘要

In a context of increasing struggles over access to water and environmental challenges, this chapter analyzes institutional efforts to support integrated water resources management in the framework of the Phuoc-Hoa Water Resources project (funded by Asian Development Bank [ADB] and Agence Francaise de Development [AFD] in 2006-2018) that concurrently aimed to increase the Dau-Tieng Reservoir's capacity and water infrastructure. The chapter investigates the institutional development process for management of the Dau-Tieng water resources system in a context of multiple uses and increasing environmental challenges to water quality and quantity, especially under the current obvious and severe effect of salinity intrusion. The chapter then sheds light on local dynamics surrounding the efforts to apply participatory irrigation management (PIM) and to increase agricultural productivity in Tan-Bien irrigated areas developed under the Phuoc-Hoa project. Through the case of the Phuoc-H6a project, the chapter emphasizes the difficulty of defining the right unit for action in a context of shifting environmental and social conditions and the need to allow more flexibility and time in building water institutions. This chapter also seeks to contribute an empirical case study to the large and increasingly important literature on water governance in Southeast Asia and other developing areas. The chapter builds on the results of a multidisciplinary research project on local water governance in the Dong-Nai basin. The research project's results, while contributing to the pool of scientific knowledge, will help the AFD reflect on the factors driving and limiting the legacy of the development project.
机译:在对获取水和环境挑战日益斗争的背景下,本章分析机构的努力,支持水资源综合管理的福,安和水资源项目(亚洲开发银行[ADB]和法新电开发署资助的框架[AFD在2006年至2018年),其同时旨在提高该DAU-Tieng水库的能力和水利基础设施。该章对制度建设过程中多次使用的情况下的斗-Tieng水资源系统的管理,提高水的质量和数量的环境挑战,特别是在盐水入侵的电流明显和严重的影响。然后本章周围申请参与灌溉管理(PIM),并增加在坦边农业生产灌溉的福,安和项目开发领域的努力当地的动态揭示光。通过福-H6A项目的情况下,章强调换挡环境和社会条件和需要,允许在建水机构更多的灵活性和时间的情况下确定合适的单位采取行动的难度。本章还寻求在东南亚的水治理和其他发展中地区贡献的实证案例研究,以大和越来越重要文献。本章建立在对在东奈盆地局部水治理的跨学科研究项目的结果。该研究项目的成果,同时促进科学知识的游泳池,将有助于AFD驾驶和限制发展项目的遗留因素反映。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号