首页> 外文会议>Computational Civil Engineering Conference >The influence of construction and service stages on the internal forces of prestressed precast beams
【24h】

The influence of construction and service stages on the internal forces of prestressed precast beams

机译:建筑和服务阶段对预应力预制梁内部力的影响

获取原文

摘要

The accurate design of prestressed precast beams is correlated with the proper evaluation of construction and service stages.On usually are considered the following construction stages:casting,transfer of prestressing,storage time,transport and mounting stage.In the presented paper,it will be illustrated the stress development on the beams by altering the specific times between different construction and service stages as a result of using different construction technologies as well as a consequence by imposing in advance different requirements during the design phase.To highlight these particularities IDEA StatiCA software was used,and a comparison between various cases is presented.
机译:预应力的预制梁的准确设计与建筑和服务阶段的适当评估相关。通常被认为是以下施工阶段:铸造,预应力转移,储存时间,运输和安装阶段。在提出的论文中,它将是通过使用不同的施工技术改变不同的建筑和服务阶段之间的特定时间来说明了光束上的应力开发,以及通过在设计阶段预先施加不同的要求,突出了这些特殊性的理念,因此突出了这些特殊性的思想使用,并提出了各种案例之间的比较。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号