首页> 外文会议>International Seminar on Geometallurgy >(Chapter 4) Comminution testwork in a geometallurgical plan and assessment of confidence in projections of mill feed rates
【24h】

(Chapter 4) Comminution testwork in a geometallurgical plan and assessment of confidence in projections of mill feed rates

机译:(第4章)在几何冶金计划中进行粉碎验证,并对轧机饲料率预测的评估

获取原文

摘要

Several test protocols are available for assessing variability andinterpretation of test results, and the input of test results intosimulation programs for projection of mill feed rates for acomminution circuit. The degree of confidence in suchpredictions is of paramount concern to mine owners and theirfinancial supporters, to meet cash flow targets, commercialproduction dates, and avoid risk of failure. Its assessment shouldinvolve resource and mine production geologists, mine planningengineers, as well as a comminution specialist(s), and mill/motordesigners. Critical items are: The number of test samples inrelation to the mineable tonnage of the resource, the projectstage (i.e., conceptual, pre-feasibility, feasibility, or bankableincludingbasic engineering, as well as start-up, commissioning,the payback period, and on-going hardness characterization, e.g.,10 years including potential for expansion). Contiguous sampleintervals are preferred, from which test samples are selected, ineach drill hole which is sited to intersect lithology and alterationzones within cut-off grade limits.
机译:几种测试协议可用于评估测试结果的可变性和诠释,以及用于对外交电路进行轧机饲料速率的投影的测试结果的输入。这种公正因素的信心程度对我的业主和零字资金支持者来说至关重要的关注,以满足现金流量目标,商业生产日期,并避免失败的风险。它的评估应该是资源和矿山生产地质学家,矿山训练者,以及粉碎专家,以及磨坊/摩托车人员。关键项是:测试样品的数量衡量资源的可弥射吨位,ProjectStage(即,概念性,可行性,可行性,可行性或可靠性,或者银行武装入职,以及启动,调试,投资回收期和开关对硬度表征,例如10年,包括扩张潜力)。优选邻接样品植物,从中选择试验样品,钻孔的钻孔坐在截止级限制内与岩性和抗改变区相交。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号