首页> 外文会议>International Conference on Management, Education and Information >Preliminary Considerations of the Planning for Bohai Strait Subsea Tunnel
【24h】

Preliminary Considerations of the Planning for Bohai Strait Subsea Tunnel

机译:渤海海峡海底隧道规划的初步思考

获取原文
获取外文期刊封面目录资料

摘要

Object: This paper is concentrated on the key problems of natural condition, line planning, landing sites, transportation mode, cross section and longitude section of Bohai strait subsea tunnel. Methods: Bohai strait subsea tunnel is mainly researched by investigation of natural condition, comparison of analogous engineering, analysis of transportation mode, and the features of railway tunnel and highway tunnel. Results and Conclusions: A scheme of full deep tunnel is suggested in Bohai strait. The proposal planar line of subsea tunnel starts from Laotieshan cape of Lvshun, ends at Donggang in Penglai, passing through Beihuangcheng island, Daqin island, Tuoji island, Beichangshan island, Nanchangshan island from north to South between the line section. The line is 114km long. One shaft is set up separately for ventilation at Laotieshan cape, Beihuangcheng island, Beichangshan island and Donggang. Landing point in Shandong Peninsula is located at Donggang in Penglai and another landing point in Dalian is located at Laotieshan cape. Railways are used as transportation method and a piggy back system is proposed. To avoid all kinds of risks, the tunnel is about 80m below the sea floor. The linear of longitudinal section is designed as W shape and the maximum longitudinal slope is set as 18%o, then the tunnel's length is about 125km. Cross section of the tunnel is a combination of double tubes and single tube, serving for the trains and other functions individually. The train speed is designed as 250km/h.
机译:目的:本文集中在渤海海峡海峡隧道的自然状况,线路规划,着陆网站,运输方式,横截面和经度段的关键问题。方法:渤海海峡海底隧道主要通过调查自然条件,类似于工程,交通模式分析的比较以及铁路隧道和公路隧道的特点。结果与结论:渤海海峡中建议了全深隧道方案。海底隧道的建议平面线从Lvshun的Laotieshan Cape开始,在蓬莱的东港的结束,通过北煌城岛,大秦岛,北京山岛,南昌山岛,从北向南到南部。该线路长114千米。一个轴在Laotieshan Cape,Beihuangcheng Island,Beichangshan Island和Donggang进行通风。山东半岛的着陆点位于蓬莱的东港,大连的另一个着陆点位于老挝山斗篷。铁路用作运输方法,提出了捎带系统。为避免各种风险,隧道在海底下面约为80米。纵向截面的线性设计为W形,最大纵向斜率设定为18%O,然后隧道的长度约为125km。隧道的横截面是双管和单管的组合,单独为列车和其他功能提供。火车速度设计为250km / h。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号