首页> 外文会议>World Multidisciplinary Civil Engineering, Architecture, Urban Planning Symposium >Modelling of Efficiency Evaluation of Traditional Project Delivery Methods and Integrated Project Delivery(IPD)
【24h】

Modelling of Efficiency Evaluation of Traditional Project Delivery Methods and Integrated Project Delivery(IPD)

机译:传统项目交付方法效率评价建模及综合项目交付(IPD)

获取原文

摘要

The classic triad”owner-architect-general contractor”are the main participants of traditional projects.They make contracts that regulate the rights and obligations of the parties and establish procedures for solving the entire range of issues during the operation of contractual relations.However,modem projects,especially large ones,require a wide range of participants.Taking into account the large number of project participants,it becomes very important to optimize the cooperation between them.The problems with communication leads to the division of the construction process to the stages,the significant number of changes and non-operating costs,and as a result to the increased project duration and increased costs.The research analyzes the core,characteristics and principles of the Integrated Project Delivery(IPD)and establishes the connection between it and the traditional project delivery methods.The IPD accumulates some of their special features and becomes the next stage in the evolution of the construction industry.One of the main characteristics of the Integrated Project Delivery is an early involvement of key participants,based on the following principles: early involvement,early goal definition,intensified planning,and organization and leadership.The aim of the research is to compare the effectiveness of the traditional project delivery methods and the Integrated Project Delivery by the criterion of the total cost for project modification.Methods of mathematical modeling were used to compare the effectiveness of the various project delivery methods.Thus,such curves and functions of dependence were modeled: between the increase in the cost of the project modifications and the period of their delivery;between the intensity of changes made to the project and the time when traditional project delivery methods are used;between the intensity of project modifications and the time on application of the Integrated Project Delivery.By means of the integral calculus(Simpson's rule)it was determined the total cost of the project modifications,which is a function of the method of project delivery and the cost of making the appropriate changes.The result of the calculations proves that the use of the integrated project delivery model reduces the total cost of making changes by 33%.
机译:经典的Triad“Owner-Archite-General承包商”是传统项目的主要参与者。他们制定了规范缔约方的权利和义务的合同,并建立了合同关系运作期间解决整个问题范围的程序。但是,调制解调器项目,尤其是大量的项目,需要广泛的参与者。考虑到大量的项目参与者,优化它们之间的合作变得非常重要。通信的问题导致施工过程的划分为阶段的施工过程的划分,大量的变化和非运营成本,结果增加了项目持续时间和增加的成本。研究分析了综合项目交付(IPD)的核心,特点和原则,并建立了它与其之间的联系传统的项目交付方法。IPD积累了一些特殊功能,成为EVOL中的下一阶段建筑业的浅析。综合项目交付的主要特点是重点参与者的早期参与,基于以下原则:早期参与,早期目标定义,加强规划和组织和领导力。研究的目的是为了比较传统项目交付方法的有效性和通过项目修改总成本的标准来比较传统项目交付方法的综合项目。数学建模的方法用于比较各种项目交付方法的有效性.thus,这种曲线和功能依赖性被建模:项目修改成本和其交付期间之间的增加;在使用该项目的变化强度和传统项目交付方法的时间之间;项目修改的强度与综合项目交付的应用时间。积分的装置(SIM PSON的规则)确定项目修改的总成本,这是项目交付方法的函数和制作适当变化的成本。计算结果证明了综合项目交付模式的使用减少了总成本减少33%。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号