A Life-Cycle Cost Analysis of Railway Turnouts Exposed to Climate Uncertainties

机译:暴露于气候不确定性的铁路投票的生命周期成本分析

获取原文

摘要

Turnouts are the critical components of modern railway tracks where the vehicle movement is transferred between two continuing tracks,inevitably resulting in high dynamic forces on the turnout system which eventually cause the turnout failures.Consequently,the turnouts have imposed operational restrictions such as operational limits for speed,axle load and headway,and high maintenance works on the system.Numerous studies have been carried out to find a mitigation method for turnout failures.Nonetheless,most of the studies consider the physical phenomena.Hence,it is believed that it would be beneficial to investigate the problem from the economic aspect.For this purpose,a life-cycle cost analysis is done for turnouts,particularly crossing nose in this study.Life-cycle cost analysis is a total cost estimate of a system or a component from acquisition to disposal,to find a cost-effective solution.It could be a simple analysis based on an expert's judgement to evaluate the feasibility or complex analysis using statistical theories covering the uncertainties to decide the budget.In this study,the life-cycle cost analysis relies on the breakdown work structure based on the reports published by the biggest Infrastructure Manager in the United Kingdom.Additionally,the effects of extreme weathers are also concerned while calculating the life-cycle cost.The results indicate that crossing renewal and tamping activities have high costs similar to miscellaneous maintenance costs.Another interesting result is that maintenance costs could be as high as acquisition costs.Finally,crossing nose renewal and maintenance costs seem to occupy high shares in the maintenance budget.
机译:投票率是现代铁路轨道的关键组成部分,其中车辆运动在两个持续轨道之间传输,不可避免地导致润路器系统上的高动态力,最终导致润路器失败。应对,投票率施加了诸如操作限制的运行限制Speed,Axle Load和Abigway和System上的高维护工作。已经开展了营业额失败的缓解方法..不可取的,大多数研究都考虑了物理现象。因此,据信这将是有益于调查经济方面的问题。对于此目的,为投票站进行生命周期成本分析,特别是在本研究中交叉鼻子.Life-cycle成本分析是系统或收购组件的总成本估计处理,寻找具有成本效益的解决方案。它可能是一个简单的分析,基于专家的判断来评估可行性或C Omplex分析使用涵盖不确定性来决定预算的统计理论。本研究中,生命周期成本分析基于英国最大基础设施经理发布的报告依赖于崩溃工作结构.Aditionally,极端的影响在计算生命周期成本的同时也担心。结果表明,交叉更新和夯实活动具有与杂项维护成本相似的高成本。其他有趣的结果是维护成本可能会高达收购成本。最后,穿越鼻子更新维护成本似乎在维护预算中占据了高股。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号