首页> 外文会议>International Conference on Engineering Sciences >Evaluation of risk factors affecting the implementation time for residential complex projects in Iraq
【24h】

Evaluation of risk factors affecting the implementation time for residential complex projects in Iraq

机译:影响伊拉克住宅复杂项目实施时间的风险因素的评价

获取原文

摘要

Residential complex projects represent one of the most important infrastructure project types in Iraq, as these plays a significant role in housing provision. In recent years, various types of risks that may occur during the implementation stage of residential complex projects have been identified. To accomplish these projects successfully, it is thus very important to manage these risks where they may affect project objectives in terms of cost, time, and quality, and risks often cause delays or cost overruns. The concept of risk management is to develop a systematic process that includes planning, identification, response planning, analysis, and assessment of both qualitative and quantitative variables, monitoring and mitigation of risks. This research thus aims to identify, assess and analyse the factors related to risks that may affect the implementation time for residential complexes projects by means of conducting statistical analysis using IBM SPSS v22 and Microsoft Excel to determine the severity risk for such project risks based on a relative importance index. This data for this was gathered by means of a questionnaire, field survey, and personal interviews. The questionnaire consisted of three parts, with the first part including general information about the sample; the second part included 17 queries about applications of risk management systems as a methodology; and the third part discussed the probability of occurrence and impact of risks, with 57 factors considered. The results of the statistical analysis showed that only four out of the 17 items in section 2 were applied; further, by analysing responses to the 57 factors, only 25 factors were found to have high impacts on risk occurrence in residential complex projects in Iraq. This suggests that only 44% of time overruns in residential complex projects may occur due to risk factors. The most important factors in terms of high impact are executing works that do not conform to specifications, which leads to rejecting and returning works, inaccuracy of schedule, and delayed payment of advances in accordance with the contract.
机译:住宅复杂项目代表伊拉克最重要的基础设施项目类型之一,因为这些项目在住房条款中发挥着重要作用。近年来,已经确定了住宅复杂项目的实施阶段可能发生的各种类型的风险。为了成功完成这些项目,因此管理这些风险非常重要,在那里他们可能会在成本,时间和质量方面影响项目目标,风险往往会导致延误或成本超支。风险管理的概念是制定一个系统的过程,包括规划,识别,响应计划,分析和评估定性和定量变量,监测和缓解风险。因此,该研究旨在通过使用IBM SPSS V22和Microsoft Excel进行统计分析来识别,评估和分析可能影响住宅复合资源项目的实施时间的风险,以便根据a相对重要指标。此用于此数据通过调查问卷,现场调查和个人访谈收集。调查问卷由三个部分组成,第一部分包括有关样本的一般信息;第二部分包括17个关于风险管理系统作为一种方法的查询;第三部分讨论了风险发生的可能性和影响,有57个因素。统计分析的结果表明,第2章中的17项中只有四项中只有四个;此外,通过分析对57个因素的反应,发现只有25个因素对伊拉克住宅复杂项目的风险发生影响很高。这表明,由于危险因素,只有44%的逾期逾期运行可能发生。高影响力的最重要因素正在执行不符合规范的作品,这导致拒绝和返回工作,不准确的时间表,并按照合同延迟支付的预付款。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号