首页> 外文会议>International Conference on Energy and Mining Law >Indonesia's Transformation to Gross Split Contract: an Evaluation of Energy Worker Regulation
【24h】

Indonesia's Transformation to Gross Split Contract: an Evaluation of Energy Worker Regulation

机译:印度尼西亚对批量合约的转型:对能源劳动监管的评估

获取原文

摘要

This paper aims to analyze the evaluation of the energy worker regulation that has been transformed to gross split contract. As the Government of Indonesia changed the PSC scheme with cost recovery to the scheme of gross split revenue contract through the Regulation of Minister of Energy and Mineral Resources No. 52 Year 2017 on Amendment to Regulation of the Minister of Energy and Mineral Resources No. 8 Year 2017 on the Gross Split Revenue Contract, the production sharing is set for the base split, which can then be adjusted to the revenue-generating components. This is unlike the conventional profit-sharing contracts, where the share of production between the Government and contractor is fixed. While the new system is expected to reduce the replacement cost incurred by the government when using the PSC scheme, it arises several issues. The oil and gas operator is given freedom to operate without government interference. When the oil and gas work contract expired, one of the things that comes to mind is whether the old worker will be re-employed by a new operator or not. With article 33 of the 1945 Constitution of the Republic of Indonesia as the basis for implementation in the economic sector, including oil and gas, we can see the contradiction between cost efficiency and social protection for all citizens. The results show that there are no regulations that specifically regulate the status of oil and gas workers at the time of contract expiration. Therefore, the need for protection is indispensable. Several steps may be taken, including the adoption of provisions in the Transfer of Undertakings (Protection of Employment) Regulations Year 2006 into the law of labor-related legislation in Indonesia as well as by streamlining the Regulation of Minister of Energy and Mineral Resources No. 15 Year 2015 on Management of Oil and Gas Working Areas Whose Contract of Cooperation is Expired.
机译:本文旨在分析对批量拆分合同转变的能源劳动监管的评价。由于印度尼西亚政府改变了PSC计划,通过调查了2017年第52届的能源和矿产资源部长修正案,以重新分配收入合同的成本恢复,根据“能源和矿产资源部长”第8号修正案2017年关于总拆分收入合同,为基本拆分设定生产共享,然后可以将其调整到收入生成组件。这与传统的盈利共享合同不同,政府与承包商之间的生产份额是固定的。虽然当使用PSC计划时,预计新系统将减少政府产生的替代成本,但它出现了几个问题。石油和天然气运营商在没有政府干扰的情况下自由于运作。当石油和天然气工作合同过期时,思想的一件事是旧工人是否将由新的运营商重新雇用。与1945年度印度尼西亚共和国宪法第33条作为经济部门执行基础,包括石油和天然气,我们可以看到所有公民的成本效率和社会保护之间的矛盾。结果表明,在合同到期时,没有特别规范石油和天然气工人的状况。因此,保护​​保护是必不可少的。可以采取几个步骤,包括通过在2006年的承诺转移(雇佣)规定的规定进入印度尼西亚劳动有关立法法的规定,并简化了能源和矿产资源部长的规定2015年15年关于合作合同合同的石油和天然气工作区的管理。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号