Vestflanken 2 (VF2) is an ongoing field development project in the Oseberg area. The development concept chosen includes an unmanned wellhead platform (Oseberg H) with seven gas lifted production wells, two gas injection wells in addition to two sub-sea production wells using existing infrastructure. Four of the production wells will be multi-laterals completed with autonomous inflow control devices (AICDs). AICDs in VF2 wells have two main objectives: ? Accelerate oil production by delaying gas breakthrough ? Choke back gas after gas breakthrough AICDs have been successfully implemented at the Troll field, and further implementation on other fields are pursued. There are differences between fields and careful considerations must be taken when implementing the technology on a new field development like VF2. It is essential to select a type and size of the AICD that fit the application. This paper discusses the process of selecting the AICD flow capacity. The lower completion design was based on experiences and results from inflow simulations. However, the design for future wells will be made based on production experience from the first VF2 wells in production. This paper also discusses the clean-up and start-up of the first VF2 well and presentation of results. The well is well instrumented with downhole P/T gauge and multi phase flow meter on well head. This is the operators first AICD well equipped with multi phase meter which makes it a very good candidate for evaluating flow performance and AICD efficiency. The well was started October 2018. Step-rate tests were performed on both branches and on the comingled MLT production. This allowed to compare measured data from the multi-phase meter to results obtained by the simulation model. The simulation results matched the measured data to a varying degree with different model assumptions. The initial well performance data and simulation model will be valuable tools when evaluating AICD design for future wells.
机译:VestFlanken 2(VF2)是Oseberg地区的正在进行的现场开发项目。选择的开发概念包括一个无人井口平台(Oseberg H),其中七个气体升起的生产井,两个气体注入井除了使用现有基础设施的两个亚海生产井。四个生产井将是多个窗口,自动流入控制装置(AICDS)完成。 VF2 Wells中的AICDS有两个主要目标:通过延迟天然气突破来加速石油产量?在巨大的巨石领域成功实施了气体突破AICDS后扼流回气,并追求其他领域的进一步实施。在实现新的现场开发时,必须在vf2等新现场开发时拍摄差异之间的差异。必须选择适合应用程序的AICD的类型和大小。本文讨论了选择AIDD流量的过程。较低的完成设计基于流入模拟的经验和结果。然而,将根据生产中的第一个VF2井的生产经验制作未来井的设计。本文还讨论了第一个VF2的清理和启动并呈现出结果。井在井下P / T测量仪和井头上的多相流量计提供良好。这是操作员首次配备多相仪表,这使其成为评估流动性能和AICD效率的非常好的候选者。该井于2018年10月开始。分支机构对分支机构进行阶梯率测试。这允许将测量数据与模拟模型获得的结果进行比较。仿真结果与测量数据匹配到具有不同模型假设的不同程度。在评估未来井的AICD设计时,初始井性能数据和仿真模型将是有价值的工具。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号