Sleipner B-1 Straddle Operation and Crossflow Project

机译:Sleipner B-1跨行操作和横流项目

获取原文

摘要

Sleipner Vest is a large gas-condensate field which is produced by pressure depletion. Currently (January 2018) the best production well is B-1. B-1 is placed in a segment with very strong pressure support from aquifer. In summer 2016, it was about to water out. A straddle operation was planned and executed. The straddle operation was very successful. More than a year later, B-1 still produced more than twice as much as any other Sleipner well. However, the water is eventually expected to come back in the remaining perforations. Concepts for crossflowing the gas and water production from the well into another reservoir has been investigated.
机译:Sleipner背心是一种大型气凝矿,由压力耗尽产生。目前(2018年1月)最好的生产良好是B-1。 B-1放置在含水层具有非常强大的压力支撑的段中。在2016年夏天,它即将推出。计划和执行跨行操作。骑行操作非常成功。超过一年后,B-1仍然生产的两倍以上的任何其他流水者。然而,水最终预期将返回剩余的穿孔。已经研究了从井中交换到另一个水库的煤气和水产的概念。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号