Planning Execution of FIELD 1 Subsea Facilities Decommissioning

机译:现场1海底设施退役的规划与执行

获取原文

摘要

The scope of the subsea field abandonment comprises plugging & abandonment(P&A)of subsea well, topside preparation,pipeline flushing and removal of subsea equipments like the wellhead christmas tree, sections of pipeline(expansion spool)and sections of umbilical control line.The remaining pipeline on seabed toward host platform will be left in-situ.These are the scope of the concept selected in DOA,which were further matured in Abandonment Plan. Objectives of the project are: 1.Improve safety and eliminate integrity risk 2.Eliminate OPEX for Well that has demonstrated no further potential for economical production 3.Fulfil PSC Abandonment Obligation Plan The execution of the subsea field abandonment harnessed resources from various specialties ranging from CAT3 to Wells,CAT1 and Subsea,coherently progressing as a single team.A good deal of attention was paid to the technical integrity and long term plan of existing asset,which also played a major role setting the magnitude of work. Lacking in experience in abandonment,we leveraged on the existing industrial resources and expertise where required,in order to realise a cost-effective execution.The activities were planned in accordance with applicable Production Sharing Contract,PETRONAS Procedures and Guidelines for Upstream Activities (PPGUA)3.0,Shell Internal Guidelines,and the applicable local and international regulations. Overall execution strategy and schedule was considerably influenced by pipeline flushing method and schedule of existing resources,which could be fairly aggressive,in contrary to popular belief that abandonment projects are not schedule driven. Bundling of activities is the key to cost-effective execution,though the challenge escalates as we move from bundling of activities,to bundling of campaigns.
机译:海底遗弃的范围包括海底井,顶部制备,管道冲洗和拆除海底设备,如井口圣诞树,管道(扩展线轴)部分和脐带控制线的部分的堵塞和放弃。其余的海底上朝向主机平台的管道将留在原位。这些是在DOA中选择的概念的范围,在遗弃计划中进一步成熟。该项目的目标是:1.improve安全和消除诚信风险2.欧普克斯妥善了解,这已经证明了经济生产的进一步潜力3.Fulfil PSC放弃义务计划的海底遗弃利用来自各种专业的资源CAT3到Wells,Cat1和海底,作为单一团队的一致性进展。对现有资产的技术诚信和长期计划支付了很大的关注,这也起到了制定工作规模的重要作用。缺乏遗弃经验,我们利用现有的工业资源和所需专业知识,以实现成本效益的执行。根据适用的生产分享合同,百级程序和上游活动指南(PPGUA指南,计划的活动计划3.0,外壳内部准则,以及适用的地方和国际法规。总体执行策略和时间表受管道冲洗方法和现有资源的时间表,这可能相当侵略,违背放弃项目不安排驱动的流行信念。捆绑活动是经济效益执行的关键,尽管挑战随着我们从捆绑活动而搬迁时,挑战升级,以捆绑竞选活动。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号