This paper covers the End-of-Field Life management and abandonment planning for four subsea fields. Scope includes end-to-end planning from confirming cessation of production with the Regulator,to Abandonment Planning,actual Implementation and Execution. PETRONAS Procedures and Guidelines for Upstream Activities(PPGUA),Company internal guidelines and Industry Practices are available for End-of-Field Life management,Abandonment Planning and Execution.These guidelines were used pragmatically in addressing both technical and non-technical challenges on these four fields,including but not limited to PSC Obligations and Regulatory Compliance, Selection of Abandonment Concept,Execution Strategy,etc.The lack of experience in subsea field abandonment provided a unique opportunity for collaboration among industry players,constructive challenges,and the acceptability of new ideas including ways of working,processes and implementation of rules/guidelines. There are six subsea wells in these four fields,in different water depths,some of which are in a cluster while others are not.The scope and timeline for each was evaluated on individual basis to draw alignment with its field and PSC-specific requirements;some are thereafter bundled together into a campaign to gain efficiency and savings via a broader synergy approach. Two broad scopes were considered: Wells Plug and Abandonment(P&A),and Subsea facilities decommissioning and abandonment.All wells P&A are aligned to industry practice and PPGUA.Field in shallower water was planned for full decommissioning and abandonment with subsea tree removed and recovered;a new diverless flushing tool(developed in collaboration with subsea vendor)was used to clean the pipeline that will be left in-situ.For field in deeper water(more than 100 meters),comparative assessment was carried out and the results support”leave in-situ”concept.Fit-for-purpose Marine Biology assessment was carried out by a local university to support this concept.The plan is to have this abandonment concept presented to the relevant Government Agencies for final approval.
机译:本文涵盖了四个海底领域的现场终身管理和遗弃计划。范围包括确认与监管机构的生产停止生产的端到端计划,以放弃规划,实际实施和执行。上游活动(PPGUA),公司内部准则和行业实践的PETRONAS程序和指南可用于现场终身管理,放弃规划和执行。这些指南在务必法地用于解决这四个技术和非技术挑战领域,包括但不限于PSC义务和监管遵守,选择遗弃概念,执行策略等。缺乏海域遗弃经验,为行业球员,建设性挑战和新想法的可接受性提供了独特的机会。包括规则/指南的工作,流程和实施方式。这四个领域中有六个海底孔,在不同的水深,其中一些在一个集群中,而其他水域则不是。每个都是在个人基础上进行评估的范围和时间表,以利用其现场和PSC特定要求进行对齐;此后,有些是通过更广泛的协同方法获得效率和节省的运动。考虑了两个广泛的范围:井插头和遗弃(P&A),海底设施退役和放弃。所有Wells P&A与行业实践和PPGua.Field在较浅的水中进行了调整,较浅的水,拆除了海底树的全额退役和遗弃;使用新的Diverless Flushing工具(与海底供应商的合作开发)用于清洁将在原位留下的管道。对于更深的水(超过100米),进行比较评估,结果支持“原位“概念。作品,目的是出于目的的海洋生物学评估,由当地大学进行支持,支持这一概念。该计划是让这一遗弃概念提交给有关政府机构的最终批准。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号