首页> 外文会议>International Conference on Industrial and Systems Engineering >Effective production planning for purchased part under long lead time and uncertain demand: MRP Vs demand-driven MRP
【24h】

Effective production planning for purchased part under long lead time and uncertain demand: MRP Vs demand-driven MRP

机译:在长时间发出时间和不确定的需求下,购买部分的有效生产计划:MRP与需求驱动的MRP

获取原文

摘要

MRP as a production planning system is appropriate for the deterministic environment. Unfortunately, most production systems such as customer demands are stochastic, so that MRP is inappropriate at the time. Demand-Driven MRP (DDMRP) is new approach for production planning system dealing with demand uncertainty. The objective of this paper is to compare the MRP and DDMRP for purchased part under long lead time and uncertain demand in terms of average inventory levels. The evaluation is conducted through a discrete event simulation with the long lead time and uncertain demand scenarios. The next step is evaluating the performance of DDMRP by comparing the inventory level of DDMRP with MRP. As result, DDMRP is more effective production planning than MRP in terms of average inventory levels.
机译:MRP作为生产计划系统适用于确定性环境。遗憾的是,大多数生产系统,如客户需求都是随机的,使MRP当时是不合适的。需求驱动的MRP(DDMRP)是处理需求不确定性的新方法。本文的目的是将MRP和DDMRP在长的时间内比较了在平均库存水平方面的长时间发出时间和不确定的需求。评估是通过具有长次延长时间和不确定需求方案的离散事件模拟进行的。下一步是通过将DDMRP与MRP的库存级别进行比较来评估DDMRP的性能。结果,在平均库存水平方面,DDMRP比MRP更有效的生产计划。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号