首页> 外文会议>Nutrient removal and recovery conference >Using Collaborative Efforts To Maximize Nutrient Removal Permit Compliance During Facility Upgrade Construction
【24h】

Using Collaborative Efforts To Maximize Nutrient Removal Permit Compliance During Facility Upgrade Construction

机译:利用协作努力在设施升级建筑过程中最大化营养消除许可符合性

获取原文

摘要

Meeting stringent effluent permit limits for nitrogen and phosphorus is always challenging, but particularly during construction of a major facility upgrade project with significant impacts on the secondary treatment tankage, equipment, electrical, and control systems. This paper presents a case study of the Enhanced Nutrient Removal (ENR) Upgrade of the 56.7 MLD (15 mgd) Cox Creek Water Reclamation Facility (WRF) in Anne Arundel County, Maryland. New NPDES permit limits for total nitrogen (TN) and total phosphorus (TP) took effect midway through the five year construction project to convert the facility from conventional Modified-Ludzack Ettinger (MLE) activated sludge to a 4-stage membrane bioreactor (MBR). This paper details how engineering and plant operations staff worked together to assess and optimize plant performance during construction of the new facility as they sought to meet the new permit limits despite the new facilities not being complete.
机译:满足氮气和磷的严格污水许可限制始终是具有挑战性的,但特别是在建造主要设施升级项目期间,对次要处理池,设备,电气和控制系统产生重大影响。本文介绍了马里兰安妮阿里德尔县56.7 MLD(15 MGD)Cox Creek水回收设施(WRF)的增强营养去除(REN)升级。新的NPDES允许总氮(TN)和总磷(TP)的限制通过五年的建设项目中途生效,将该设施转换为从常规改性 - Ludzack Ettinger(MLE)活性污泥到4阶段膜生物反应器(MBR)。 。本文详细了解工程和工厂运营人员如何共同努力评估和优化在建造新设施时的植物表现,尽管新设施没有完整,但尽管新的设施仍然可以满足新的许可限制。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号