Agile Field Development Planning: A Systems Approach

机译:敏捷现场开发规划:系统方法

获取原文

摘要

It can take months,perhaps a year or two,to get through Front End Loading(FEL)stages with the current industry approaches. As the industry strives to be more efficient,faster to market in this lower for longer world,we need a different and much faster,lower risk approach that does not erode value. Multiple tools exist that allow subsurface/surface simulation integration and coupling,but these are cumbersome to configure and not appropriate for an early field development at the stage of pre-FEED(Front End Engineering and Design). To meet this challenge,an agile approach to Field Development Planning(FDP)has been established. The approach is inspired by agile project management techniques and best practices that are currently used in the automotive,aerospace,construction,software development industries and lean start-ups. It is based on parallel sprints rather than the waterfall approaches to project management. Collaborative teams work on parallel deliverables to create a minimum viable product(MVP)and value drivers for further development are established quantifiably with an Analytic Hierarchy Process(AHP). The notion of a fully representative dynamic techno-economic model is presented. This model applies a multi-dependent system thinking approach,with dynamic integration of economic,reservoir,subsea,facilities and schedule data. Two case studies are discussed where this approach was used to maximise economic benefits of the asset and accelerate the decision-making process during FEL stages: 1. Identification of the best compression solution to optimise the economic outcome of production from a complex group of 350 wells intersecting different reservoirs. The result of this example was an 18-month acceleration of the decision process and 30% cost saving. 2. Deciding whether the FEED should be oriented towards simultaneous or sequential production for the development of two marginal offshore satellite fields. This presentation will be of interest to anyone looking to speed up the time to first oil/gas and reduce production costs on undeveloped or underdeveloped fields and bid more confidently on assets during licence rounds with less risk. It will also be of interest to those wanting to accelerate their decision-making process during FEL stages from months or years to weeks and allow decision makers to visualise and test interdependencies creatively with less cognitive bias.
机译:它可能需要数月,也许一两年或两两年,通过现有的行业方法来完成前端装载(FEL)阶段。随着行业努力更加效率,在较长的世界中,我们需要更低的市场,我们需要不同,更快,较低的风险方法,不侵蚀价值。存在多种工具,允许地下/表面仿真集成和耦合,但在饲料前阶段(前端工程和设计阶段,这些都是繁琐的。为满足这一挑战,已经建立了一个敏捷的现场发展规划(FDP)的方法。该方法是由敏捷项目管理技术和最佳实践的启发,目前用于汽车,航空航天,建筑,软件开发行业和精益初创企业。它基于平行冲刺而不是项目管理的瀑布方法。协作团队在并行可交付成果上工作以创建最低可行的产品(MVP)和有价值的驱动因素,可以通过分析层次过程(AHP)来规模地确定进一步开发的驾驶员。提出了完全代表性的动态技术经济模型的概念。该模型适用于多依赖的系统思维方式,具有经济,水库,海底,设施和进度数据的动态集成。讨论了两种案例研究,其中这种方法用于最大限度地提高资产的经济效益,并加快竞技阶段的决策过程:1。鉴定最佳压缩解决方案,以优化350孔复合组的经济结果。与不同的水库相交。这个例子的结果是决策过程的18个月加速,节省了30%。 2.决定饲料是否应向同时或顺序生产,以开发两个边缘离岸卫星领域。本报告将有兴趣的任何人都希望加快的时候第一次石油/天然气,减少对不发达或欠发达领域的生产成本和更小的风险时牌两轮竞价更加自信资产。那些希望在几年或几年内加速其决策过程的人感兴趣,并且允许决策者创造性地以更少的认知偏见创造性地想象和测试相互依赖性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号