首页> 外文会议>SPE International Conference and Exhibition on Formation Damage Control >Optimising Sand Control and Production Strategies in a Low Permeability Sandstone Oil Field
【24h】

Optimising Sand Control and Production Strategies in a Low Permeability Sandstone Oil Field

机译:低渗透砂岩油田优化砂控制和生产策略

获取原文

摘要

This paper presents how the sand control and management strategies of an oil field were optimised after multiple well failures between 2014 and 2016. It describes the impact of the new strategies on oil production and net present value. Field E is a sandstone field with oil and gas-cap gas at initial conditions, and has been developed with 5 production wells, 2 water injection wells, and 2 gas injection wells. The first nine wells were drilled from an offshore platform and completed with sand screens between 2012 and 2013. Production commenced in late 2013, and by the end of 2016, multiple sanding events had been reported and four of the five production wells had died. The asset team was tasked with diagnosing the cause of the well failures and developing solutions. Pressure data suggested that three of the failed wells had tubing restrictions, and the fourth failed well had a blockage upstream of the BHP gauge. The sand count data suggested significant sand production prior to well failures, and sand was also recovered from the separators. Pressure transient analysis suggested that the field had a lower permeability than the pre-development estimate, and higher pressure drawdowns were needed to produce economic oil rates from the field. It was concluded that the well failures were most likely caused by the high pressure drawdowns, which pulled sand from the reservoirs, and led to screen breakage in at least two wells and screen plugging in one well. A decision was made to re-drill the failed wells in 2016, and complete them with frac-pack sand control solutions. The drilling and production performance of the first two new wells are presented in this paper. The asset team also implemented a new and improved sand management strategy in Field E. This paper presents the lessons learnt from a new oil field impacted by sand production. It also outlines practical well diagnosis and sand management strategies, and presents simple methods of preserving well integrity and cash flow in oil fields struggling to manage sand production in a 40 USD/barrel oil price environment.
机译:本文介绍了在2014年至2016年间的多个井故障后如何优化油田的砂控制和管理策略。它描述了新策略对石油生产和净目的价值的影响。 Field E是初始条件下的砂岩领域,具有石油和煤气盖气体,并已开发出5种生产井,2个注水井和2个气体注入孔。从海上平台钻了前九个井,并在2012年和2013年之间完成了沙屏。2013年底,产量开始于2016年底,截至2016年底,据报道多次打磨事件,五种生产井中的四个井已经死亡。资产团队的任务是诊断井失败和开发解决方案的原因。压力数据表明,有三个失败的井有管制限制,第四个失败井在BHP计的上游堵塞。砂数数据建议在井失效前提出显着的砂生产,并且还从分离器中回收砂。压力瞬态分析表明,该领域的渗透率较低,比预发展估计较低,需要更高的压力下降来生产来自现场的经济漏价。得出的结论是,井故障最有可能由高压缩进引起的,从储存器中拉沙子,并导致至少两个孔和屏幕堵塞的屏幕破损。决定在2016年重新钻取失败的井,并用FRAC-Pack砂解决方案完成它们。本文提出了前两个新井的钻井和生产性能。资产团队还实施了一个新的和改进的沙子管理策略。本文介绍了由沙子生产影响的新油田中学到的经验教训。它还概述了实际井诊断和沙子管理策略,并提出了在40美元/桶油价环境中努力管理砂生产的油田完整性和现金流量的简单方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号