首页> 外文会议>SPE Nigeria Annual International Conference and Exhibition >Retrofit Gas Lift Deployment for Oil Production Optimization in OnshoreNiger Delta: A Case Study of EROTON E P Oil Fields
【24h】

Retrofit Gas Lift Deployment for Oil Production Optimization in OnshoreNiger Delta: A Case Study of EROTON E P Oil Fields

机译:Onshoreniger Delta石油生产优化的改造式气体升力部署 - 以肥胖的E&P油田为例

获取原文

摘要

OML 18, operated by Eroton Exploration and Production Company (EROTON E&P) and located withinthe Coastal Swamp of Eastern Niger Delta contains several producing fields. As a brown asset with over50 years historical production and ageing infrastructure, rapidly declining oil production caused by risingwater cut and depleting reservoir pressure has become a normal feature for most of the reservoirs in theblock. There arises therefore, urgent need to maximize the value of these mature fields by deploying fit forpurpose and cost-effective technologies and methods. Thus, we deployed artificial lift technique using the abundant associated gas resources within the assetas one method of managing the rapid decline in oil production. Gas lift is a robust and inexpensive artificiallift solution which can be deployed at any period in the life-cycle of a well. The natural reservoir energy tomove liquids to the surface through a well at expected rates declines with production time. Changing welland reservoir conditions, such as declining pressure, increasing gas liquid ratios and rising water cut canmake consistent and predictable oil production a challenge. A review of the entire wells portfolio within the asset enabled an identification of all potential candidateswith potential to benefit from gas lift installation. This was followed by feasibility studies to establish aconnection between the magnitude of expected oil resources to be added, the oil rate potential, the existingcompletion status and surface facility equipment availability such as compression, gas lines and scrubbersetc. Screening of identified opportunities, often conducted in multi-disciplinary review sessions, yieldedranked list of opportunities for further maturation through design, execution and operation. Three (3) fieldswith over 60 wells and 38 developed reservoirs were selected for the review. The screening criteria includedbut not limited to reserves to be added, ease of execution, economics and regulatory approval requirements.Since these wells were not originally equipped with gas lift mandrel, alternative means of deploying gaslift equipment downhole had to be designed and implemented. Considering the advanced age of most ofthe wells, due consideration was given to well integrity in the final execution decision. Despite inherentchallenges, EROTON was able to successfully deploy in-house technical knowledge and experience toembark on rigless well intervention campaign to restore production using retrofit gas lift equipment inexisting wells, which have ceased to flow due to vertical lift issues, thus extending the life of the wells. We have successfully performed a safe and commercially viable production restoration exercise, returninga total of twelve (12) wells back to full production potential and achieving the well intervention objectives.The operation has accelerated production adding over 5,000 bopd. This paper will discuss the conceptof brown field life extension through retrofit gas lift, the workflow utilized and results from select fieldexamples. Well BAKU-07 in RAMA field is further discussed as one of the candidates successfully restoredvia this method.
机译:OML 18由Eroton勘探和生产公司(Eroton E&P)经营,并位于尼日尔·斯蒂加东部的沿海沼泽,包含几个生产领域。作为具有超过50年的棕色资产的历史生产和老化基础设施,迅速下降由上升垫层和耗尽储层压力造成的石油产量已成为Theblock中大部分水库的正常特征。因此,迫切需要通过部署适合的福利和经济高效的技术和方法来最大化这些成熟字段的值。因此,我们使用assetas内的富裕的相关气体资源部署了人工升力技术,一种管理石油生产迅速下降的方法。燃气升降是一种坚固且廉价的艺术溶液,可以在井的生命周期的任何时期部署。天然储层通过井的表面液体通过预期的速率随着生产时间下降。改变Welland Reservoir条件,如压力下降,燃气液体比率升高,水切削率升高,油墨产量一致,石油产量呈挑战。审查资产中的整个井组合使所有潜在的候选人的识别能够从燃气升降装置中受益。随后是可行性研究,以建立要添加的预期油资源的大小之间的连接,油速潜力,现有成功状态和表面设施设备可用性,例如压缩,气体管线和扫描仪。筛选所确定的机会,通常在多学科审查会议中进行,通过设计,执行和运营进一步成熟的机会列表。选择超过60个井和38个开发的水库的三(3)个现场用于审查。附带的筛选标准不限于要添加的储备,易于执行,经济和监管批准要求。这些井最初未配备燃气升降心轴,必须设计和实施井下燃气设备的替代方法。考虑到大多数井的高龄,适当考虑在最终执行决定中善于诚信。尽管存在固有的壁灯,但艾罗顿能够成功部署内部技术知识,并在严格的井干预运动上经历Toembark,以使用改造的气体升降设备不复存在的井,这已经由于垂直提升问题而停止流动,从而延长了井。我们成功地进行了安全且商业上可行的生产恢复运动,返回总共十二(12)井回到全面的生产潜力,实现了井的干预目标。该运营加速生产增加了5,000多个Bopd。本文将讨论棕色场寿命延伸的概念通过改装气体升力,使用的工作流程和选择Field Appples的结果。 RAMA-07在RAMA字段中进一步讨论作为候选人成功恢复的候选人之一。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号