首页> 外文会议>SPE Nigeria Annual International Conference and Exhibition >Benefits of Real Time Pressure Monitoring from Surface Read out Devices Case History-Zino Hub
【24h】

Benefits of Real Time Pressure Monitoring from Surface Read out Devices Case History-Zino Hub

机译:实时压力监测从表面读出设备历史历史 - Zino Hub的好处

获取原文

摘要

The Zino Hub is a very active gas hub within the Niger Delta region responsible for the delivery of major gas production and growth projects for key customers both in the export gas domain and IPP space.There are 38 producing gas wells completed across 19 reservoirs within this hub.These wells are pivotal to the delivery of gas to ensure the daily contractual agreements allotted to the hub is met.Due to the prolific and high level of gas deliverability within the hub,the Well,Reservoir and Facility Management Plan(WRFM)is highly prioritized,rigorously challenged and implemented.As a part of the regulatory and WRFM fix the basics requirement,these reservoirs are monitored regularly to ensure they are produced under very healthy and acceptable reservoir practices.Yearly budget allocations for surveillance drives the quality and quantity of data acquired over these reservoirs.Over the years,the major source of pressure acquisition from these wells have been via gauges deployed through wireline.This of course has inherent challenges spanning from human resource deployment to acquisition sites in the face of current danger of kidnaps,high logistics cost and man power shortage,well site accessibility,unforeseen danger associated with well entries,inability to acquire data concurrently on demand without jeopardizing production(deferments)and many other threats such as escalated costs ensuing from community restiveness and demands Recently,there has been a gradual shift from the wireline pressure acquisitions to the deployment of Permanent Down Hole Gauges with surface read out facilities for some of these wells.The value and convenience vis a vis the wireline deployment can never be over emphasized.On the front line is the cost reduction achieved in surveillance cost via these PDHG deployment.The interface feeders deliver well and reservoir data directly from the wells to the office there by facilitating insitu monitoring of reservoir and well parameters and very quick analysis are done to ensure healthy production of these wells within their operating envelopes.Well performance and diagnosis are done often on demand because consistent data is available daily.The benefits accruing from this deployment is transparently contributing to a more robust,accurate and readily available data to the engineers and end users.This paper will highlight the obvious benefits of this deployment and,also recommend future improvements that would facilitate better analytical result.
机译:Zino Hub是尼日尔三角洲地区内的一个非常活跃的气体枢纽,负责在出口天然气领域和IPP空间中提供主要客户的主要天然气生产和增长项目。在其中的19个水库中完成了38个生产煤气井毂。这些井是衡量的煤气,以确保达到枢纽的日常合同协议。在集线器内,井,水库和设施管理计划(WRFM)中的多产和高水平的天然气可交付能力高度优先考虑,严格挑战和实施。在监管和WRFM的一部分解决基础要求,这些水库定期监测,以确保在非常健康和可接受的水库实践下生产。监督的预算拨款驱动质量和数量在这些水库中获得的数据。多年来,这些井的主要压力源主要是通过线路部署的仪表当然,这当然具有从人力资源部署到收购地点的固有挑战,面对当前的绑持危险,高物流成本和人力短缺,井网站可访问性,不可预见的危险,与井条目相关联,无法同时获取数据在没有危害生产(延迟)的情况下,许多其他威胁,如升级的成本,即最近在社区恢复和需求中随着升级的成本,从有线压力采集逐渐转变为带表面读出设施的永久向下孔仪的部署这些井。VI的价值和便利性永远强调了电缆部署。前线是通过这些PDHG部署的监控成本实现的成本降低。接口进料器直接从井中提供井和水库数据通过促进水库和井参数的Insitu监测办公室,非常快速完成裂解以确保在其操作信封内的健康生产这些井。常需的性能和诊断通常按需进行,因为一致的数据每天都可以使用。此部署的效益透明地促使更强大,准确和易于提供的数据对于工程师和最终用户。本文将突出此部署的明显优势,并建议将来改进,以促进更好的分析结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号