首页> 外文会议>International Conference on Engineering, Project, and Product Management >Combining Takt and Deming Cycles at Operator Level - Practical Study
【24h】

Combining Takt and Deming Cycles at Operator Level - Practical Study

机译:在操作员水平时结合Takt和Deming Cycles - 实践研究

获取原文
获取外文期刊封面目录资料

摘要

Few empirical studies have previously been reported on implementation of takt planning and controlling the workflows continuously. This paper presents a case study from the offshore renewable industry, which is closely related to construction. The paper aims to develop and trial a conceptual model for combining takt planning and PDCA, also known as the Deming cycle in construction environments. The conceptual model has furthermore been modified for a visual board implementation that covers a specified process with a fixed number of technicians per performing team. The conceptual model draws on knowledge of takt planning implementation from the lean construction community and PDCA implementation from the lean production community. The main contribution of this paper is the conceptual model combining takt planning and Deming cycle in a construction environment. This conceptual model has potential implications in the construction and refurbishment industry.
机译:以前曾报告过少数实证研究关于持续规划和控制工作流程的实施。 本文提出了离岸可再生行业的案例研究,与施工密切相关。 本文旨在开发和试验组合TABT规划和PDCA的概念模型,也称为施工环境中的凹陷周期。 此外,该概念模型还针对视觉板实施进行了修改,该实现涵盖了每个执行团队的固定数量的技术人员的指定过程。 概念模型借鉴了精益建设群落和精益生产社区的PDCA实施的TAB规划实施知识。 本文的主要贡献是概念模型与建筑环境中的TABT规划和拆除周期结合起来。 这种概念模型对建筑和翻新行业具有潜在影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号