首页> 外文会议>International Nuclear Atlantic Conference >DECOMMISSIONING STRATEGY AND SCHEDULE FOR A MULTIPLE REACTOR NUCLEAR POWER PLANT SITE
【24h】

DECOMMISSIONING STRATEGY AND SCHEDULE FOR A MULTIPLE REACTOR NUCLEAR POWER PLANT SITE

机译:多反应堆核电站现场的退役战略和时间表

获取原文
获取外文期刊封面目录资料

摘要

The decommissioning is an important part of every Nuclear Power Plant life cycle gaining importance when there are more than one plant at the same site due to interactions that can arise from the operational ones and a decommissioning plant. In order to prevent undesirable problems, a suitable strategy and a very rigorous schedule should implemented and carried. In this way, decommissioning tasks such as fully decontamination and dismantling of activated and contaminated systems, rooms and structures could be delayed, posing as an interesting option to multiple reactor sites. The present work aims to purpose a strategy and a schedule for the decommissioning of a multiple reactor site highlighting the benefits of delay operational tasks and constructs some auxiliary services in the site during the stand by period of the shutdown plants. As a case study, will be presented a three-reactor site which the decommissioning process actually is in planning stage and that should start in the next decade.
机译:退役是每核电站生命周期的重要组成部分,当由于可以从运营人员和退役工厂出现的相互作用时,同一部位有多个植物的重要性。为了防止不期望的问题,应实施和携带合适的策略和非常严格的时间表。通过这种方式,可以延迟退役任务,如激活和受污染的系统,房间和结构的完全净化和拆卸,作为多个反应堆网站的一个有趣的选择。目前的工作旨在目的是一种策略和一个关于延迟运营任务的效益的多抗反造网站的退役的计划,并在停机工厂的时期在立式期间在现场构建一些辅助服务。作为一个案例研究,将介绍一个三反应堆网站,退役过程实际上是在规划阶段,应该在未来十年开始。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号