首页> 外文会议>International Conference on Advanced Engineering and Technology Research >Analysis of Key Issues in The Frame-fixed Row-pattern Pile Cofferdam Construction of Binzhou Port
【24h】

Analysis of Key Issues in The Frame-fixed Row-pattern Pile Cofferdam Construction of Binzhou Port

机译:滨州港框架固定行模式桩围堰建设关键问题分析

获取原文

摘要

The cofferdam in the liquid bulk areas of Binzhou port haigang district used a new type of structure called the frame-fixed row-pattern pile cofferdam. It not only applies to the soft soil foundation of binzhou port, but also can be used as landing structure of pier in the late. However, the construction of this kind of structure has no more mature experience, and it is greatly influenced by the construction site environment of binzhou port. Therefore, the key problems and solutions to the construction of wall pile frame structure are analyzed.
机译:滨州港港口地区的围堰在滨州港区采用了一种称为框架固定行模式桩围堰的新型结构。它不仅适用于滨州港的软土基础,而且还可以用作码头的着陆结构。然而,这种结构的建设没有更成熟的经验,它受到滨州港施工现场环境的影响。因此,分析了墙桩框架结构构造的关键问题和解决方案。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号