Effect of averaging period on wind resource assessment for wind turbine installation project at UNITEN

机译:平均期对宁南风力涡轮机安装项目风力资源评估的影响

获取原文

摘要

Assessing the wind resource available at a particular site is the initial step of determining the feasibility of a wind turbine installation project. Several methods are frequently used to assess wind resource at a particular site, such as using wind map, local site measurement and measure-correlate-predict. A certain degree of measurement at site is needed for the final two methods. Wind speed data is usually measured and collected at a certain frequency or sampling rate, based on the resolution of the measurement device used. This data is then averaged at a certain period, depending on the standards used or its application. This research investigates the effect of having different averaging period when processing the raw wind speed data on the estimated power and energy potential of a wind turbine installation project at Universiti Tenaga Nasional (UNITEN), Malaysia. Results have shown that different averaging periods 2-minute and 10-seconds have 27.15% and 54.3% difference respectively to hourly averaged data in terms of energy yield estimation. These differences can affect a feasibility study of a wind turbine project.
机译:评估特定网站上可用的风力资源是确定风力涡轮机安装项目的可行性的初步步骤。经常使用几种方法来评估特定部位的风力资源,例如使用风图,局部站点测量和测量相关预测。最终两种方法需要在现场进行一定程度的测量。通常基于所使用的测量装置的分辨率以某种频率或采样率测量和收集风速数据。然后根据所使用的标准或其应用程序在一段时间内平均此数据。本研究调查了在加工Wensiti Tenaga Nasional(Octen),马来西亚大学风力涡轮机安装项目的估计功率和能源潜力时具有不同平均时期的效果。结果表明,在能量产量估计方面,不同的平均期2分钟和10秒分别具有27.15%和54.3%的差异分别为每小时平均数据。这些差异可能影响风力涡轮机项目的可行性研究。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号