Research on the Compensation of Construction Scheme Change in EPC Projects

机译:EPC项目施工方案变化赔偿研究

获取原文

摘要

Because of the particularity of the Engineering-Procurement-Construction (EPC) mode of the integration of design and construction. In the contract, there is no specific definition of the right and responsibility identification after the change of the construction scheme, which leads to a series disputes. In this regard, this paper summarizes three reasons that lead to the change of the construction scheme. On the basis of this, it discusses the compensation for time and cos after the change of construction scheme.
机译:由于工程采购建设的特殊性(EPC)的设计和施工集成。在合同中,在建造计划的变更后没有具体定义权利和责任识别,从而导致了一系列争议。在这方面,本文总结了导致施工方案变更的三种原因。在此基础上,它讨论了施工方案变更后的时间和COS补偿。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号