首页> 外文会议>Powertest Conference >Emergency Bushing Replacement For Power Transformers Including Generator Step Up Transformers
【24h】

Emergency Bushing Replacement For Power Transformers Including Generator Step Up Transformers

机译:紧急套管更换电源变压器,包括发电机加压变压器

获取原文

摘要

In the electrical testing business there is often the dilemma of testing the customers' transformer and discovering a bushing that has issues or concerns like rising power factors, capacitance change, insulator damage, improper oil level, leaking, or connection heating problems. The customer is looking to the test company for quick solutions to maintain and re-energize the transformer. Finding the Companies with the experience in providing quick replacement bushings can be a challenge. If a direct replacement bushing is not readily available there are other solutions to the problem. Dimensional issues can often be overcome with the utilization of a custom fabricated adaptor flange to match a readily available bushing of the same voltage and current characteristics to the application upon the transformer experiencing a problematic bushing.
机译:在电气测试业务中,通常存在测试客户的变压器的困境,并发现具有问题或疑虑的衬套,如上升电源因素,电容变化,绝缘体损坏,油位不当,泄漏或连接加热问题。客户正在寻找测试公司,以便快速解决方案,以维护和重新激励变压器。在提供快速更换衬套的经验中找到公司可能是一个挑战。如果不容易获得直接更换衬套,则存在其他问题。通过使用定制制造的适配器法兰的利用通常可以克服尺寸问题,以匹配在经历有问题的衬套的变压器上的应用与应用相同电压和电流特性的容易获得的衬套。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号