首页> 外文期刊>Electrical Times >Transformer down - dealing with emergency replacement of transformers to keep production on-line
【24h】

Transformer down - dealing with emergency replacement of transformers to keep production on-line

机译:变压器停机-处理变压器的紧急更换以保持生产在线

获取原文
获取原文并翻译 | 示例
       

摘要

Knowing about transformer construction provides the first line of defense. Rapid access to plug-and-play replacements can save hundreds of thousands of dollars per day. How much can you afford to lose? For any CEO or manager in charge of a plant that purchases electricity in bulk, that question must be faced when considering the replacement of a power transformer. If one goes down, the loss of operational capability is always crippling. The process gets interrupted, the assembly line halts, and information transfer stops. Transformers seldom go down, but when they do, the effects to the bottom line are devastating. Beyond the lost income from the sudden stoppage of the production run, the risk of subsequent fires, fines, security lapses and lawsuits can quadruple the damages. Utilising a two-pronged approach, though, facility managers can stack the odds in their favour. Prevention prevails through the selection of quality transformers, and quick replacement with an exact match can keep losses to a minimum.
机译:了解变压器构造提供了第一道防线。快速访问即插即用的替代品每天可以节省数十万美元。您能承受多少损失?对于负责批量购买电力的工厂的首席执行官或经理来说,在考虑更换电源变压器时必须面对这个问题。如果出现故障,操作能力的损失将一直处于崩溃的状态。该过程被中断,装配线停止,信息传递停止。变形金刚很少掉下来,但是当它们变形时,对底线的影响却是毁灭性的。除了因突然停止生产而造成的收入损失外,随后发生火灾,罚款,安全漏洞和诉讼的风险还会使损失增加四倍。但是,采用两管齐下的方法,设施经理可以顺其自然地增加赔率。通过选择优质的变压器来预防疾病占上风,并且快速更换精确匹配的变压器可以将损失降到最低。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号